West Virginia Code § 22-3-13

General environmental protection performance standards for surface
Open in Lexace · Ask the AI about this section
mining; variances.
(a) Any permit issued by the secretary pursuant to this article to conduct surface mining
operations shall require that the surface mining operations meet all applicable performance
standards of this article and other requirements set forth in legislative rules proposed by the
secretary. e
(b) The following general performance standards are applicable to all surface mines and
require the operation, at a minimum, to:
(1) Maximize the utilization and conservation of the solid fuel resource being recovered to
minimize reaffecting the land in the future through surface mining;
(2) Restore the land affected to a condition capable of asupporting the uses which it was
capable of supporting prior to any mining, or higher or better uses of which there is
reasonable likelihood so long as the use or uses dol not present any actual or probable
hazard to public health or safety or pose any asctual or probable threat of water diminution
or pollution and the permit applicant's declared proposed land use following reclamation is
not considered to be impractical or unreasionable, inconsistent with applicable land use
policies and plans, involves unreasognable delay in implementation or is violative of federal,
state or local law;
(3) Except as provided in subsection (c) of this section, with respect to all surface mines,
backfill, compact where advisable to ensure stability or to prevent leaching of toxic materials
and grade in order to restore the approximate original contour: Provided, That in surface
mining which is carried out at the same location over a substantial period of time where the
operation transects the coal deposit and the thickness of the coal deposits relative to the
volume of the overburden is large and where the operator demonstrates that the overburden
and other spoil and waste materials at a particular point in the permit area or otherwise
avaWilable from the entire permit area is insufficient, giving due consideration to volumetric
expansion, to restore the approximate original contour, the operator, at a minimum, shall
backfill, grade and compact, where advisable, using all available overburden and other spoil
and waste materials to attain the lowest practicable grade, but not more than the angle of
repose, to provide adequate drainage and to cover all acid-forming and other toxic materials
in order to achieve an ecologically sound land use compatible with the surrounding region:
Provided, however, That in surface mining where the volume of overburden is large relative
to the thickness of the coal deposit and where the operator demonstrates that due to
volumetric expansion the amount of overburden and other spoil and waste materials
removed in the course of the mining operation is more than sufficient to restore the
approximate original contour, the operator shall, after restoring the approximate contour,
backfill, grade and compact, where advisable, the excess overburden and other spoil and
waste materials to attain the lowest grade, but not more than the angle of repose, and to
cover all acid-forming and other toxic materials in order to achieve an ecologically sound
land use compatible with the surrounding region and the overburden or spoil shall be
shaped and graded in a way as to prevent slides, erosion and water pollution and
revegetated in accordance with the requirements of this article: Provided further, That the
secretary shall propose rules for legislative approval in accordance with article three,
chapter twenty-nine-a of this code governing variances to the requirements for return to
approximate original contour or highwall elimination and where adequate material is not
available from surface mining operations permitted after the effective date of this article for:
(A) Underground mining operations existing prior to August 3, 1977; or (B) efor areas upon
which surface mining prior to July 1, 1977, created highwalls;
(4) Stabilize and protect all surface areas, including spoil piles, affected by the surface
mining operation to effectively control erosion and attendant air and water pollution;
(5) Remove the topsoil from the land in a separate layer, reptlace it on the backfill area or, if
not utilized immediately, segregate it in a separate pile from other spoil and, when the
topsoil is not replaced on a backfill area within a time short enough to avoid deterioration of
the topsoil, maintain a successful vegetative cover by quick growing plants or by other
similar means in order to protect topsoil from wind and water erosion and keep it free of any
contamination by other acid or toxic material:s Provided, That if topsoil is of insufficient
quantity or of poor quality for sustaining vegetation, or if other strata can be shown to be
more suitable for vegetation requirements, then the operator shall remove, segregate and
preserve in a like manner any other gstrata which is best able to support vegetation;
(6) Restore the topsoil or the beest available subsoil which is best able to support vegetation;
(7) Ensure that all prime farmlands are mined and reclaimed in accordance with the
specifications for soil removal, storage, replacement and reconstruction established by the
United States Secretary of Agriculture and the Soil Conservation Service pertaining thereto.
The operator, at a minimum, shall: (A) Segregate the A horizon of the natural soil, except
where it can be shown that other available soil materials will create a final soil having a
greater productive capacity and, if not utilized immediately, stockpile this material
sepWarately from other spoil and provide needed protection from wind and water erosion or
contamination by other acid or toxic material; (B) segregate the B horizon of the natural soil,
or underlying C horizons or other strata, or a combination of the horizons or other strata
that are shown to be both texturally and chemically suitable for plant growth and that can be
shown to be equally or more favorable for plant growth than the B horizon, in sufficient
quantities to create in the regraded final soil a root zone of comparable depth and quality to
that which existed in the natural soil and, if not utilized immediately, stockpile this material
separately from other spoil and provide needed protection from wind and water erosion or
contamination by other acid or toxic material; (C) replace and regrade the root zone material
described in paragraph (B) of this subdivision with proper compaction and uniform depth
over the regraded spoil material; and (D) redistribute and grade in a uniform manner the
surface soil horizon described in paragraph (A) of this subdivision;
(8) Create, if authorized in the approved surface mining and reclamation plan and permit,
permanent impoundments of water on mining sites as part of reclamation activities in
accordance with rules promulgated by the secretary;
(9) Where augering is the method of recovery, seal all auger holes with an impervious and
noncombustible material in order to prevent drainage except where the secretary
determines that the resulting impoundment of water in the auger holes may create a hazard
to the environment or the public welfare and safety: Provided, That the secretary may
prohibit augering if necessary to maximize the utilization, recoverability or econservation of
the mineral resources or to protect against adverse water quality impacts;
(10) Minimize the disturbances to the prevailing hydrologic balance at the mine site and in
associated off-site areas and to the quality and quantity of wateru in surface and groundwater
systems both during and after surface mining operations and during reclamation by: (A)
Avoiding acid or other toxic mine drainage by such measurets as, but not limited to: (i)
Preventing or removing water from contact with toxic producing deposits; (ii) treating
drainage to reduce toxic content which adversely affects downstream water upon being
released to water courses; and (iii) casing, sealing or otherwise managing boreholes, shafts
and wells and keep acid or other toxic drainage from entering ground and surface waters;
(B) conducting surface mining operations so ass to prevent to the extent possible, using the
best technology currently available, additional contributions of suspended solids to
streamflow or runoff outside the permit area, but in no event may contributions be in excess
of requirements set by applicable stgate or federal law; (C) constructing an approved
drainage system pursuant to paragraph (B) of this subdivision, prior to commencement of
surface mining operations, thee system to be certified by a person approved by the secretary
to be constructed as designed and as approved in the reclamation plan; (D) avoiding channel
deepening or enlargemeLnt in operations requiring the discharge of water from mines; (E)
unless otherwise authorized by the secretary, cleaning out and removing temporary or large
settling ponds or oth er siltation structures after disturbed areas are revegetated and
stabilized, and depositing the silt and debris at a site and in a manner approved by the
secretary; (F) restoring recharge capacity of the mined area to approximate premining
conditions; and (G) any other actions prescribed by the secretary;
(11) With respect to surface disposal of mine wastes, tailings, coal processing wastes and
other wastes in areas other than the mine working excavations: (A) Stabilize all waste piles
in designated areas through construction in compacted layers, including the use of
noncombustible and impervious materials if necessary, and assure the final contour of the
waste pile will be compatible with natural surroundings and that the site will be stabilized
and revegetated according to the provisions of this article; and (B) assure that the
construction of any coal waste pile or other coal waste storage area utilizes appropriate
technologies, such as capping or the use of liners, or any other demonstrated technologies or
measures which are consistent with good engineering practices, to prevent an acid mine
drainage discharge;
(12) Design, locate, construct, operate, maintain, enlarge, modify and remove or abandon, in
accordance with standards and criteria developed pursuant to subsection (f) of this section,
all existing and new coal mine waste piles consisting of mine wastes, tailings, coal
processing wastes or other liquid and solid wastes and used either temporarily or
permanently as dams or embankments;
(13) Refrain from surface mining within five hundred feet of any active and abandoned
underground mines in order to prevent breakthroughs and to protect health or safety of
miners: Provided, That the secretary shall permit an operator to mine near, through or
partially through an abandoned underground mine or closer to an active unederground mine
if: (A) The nature, timing and sequencing of the approximate coincidence of specific surface
mine activities with specific underground mine activities are coordinaterd jointly by the
operators involved and approved by the secretary; and (B) the operations will result in
improved resource recovery, abatement of water pollution or elimination of hazards to the
health and safety of the public: Provided, however, That any breakthrough which does occur
shall be sealed; t
(14) Ensure that all debris, acid-forming materials, toxic materials or materials constituting
a fire hazard are treated or buried and compacted, or otherwise disposed of in a manner
designed to prevent contamination of ground or surface waters, and that contingency plans
are developed to prevent sustained combustiosn: Provided, That the operator shall remove or
bury all metal, lumber, equipment and other debris resulting from the operation before
grading release;
(15) Ensure that explosives are used only in accordance with existing state and federal law
and the rules promulgated by ethe secretary, which shall include provisions to:
(A) Maintain for a period of at least three years and make available for public inspection,
upon written request, a log detailing the location of the blasts, the pattern and depth of the
drill holes, the amount of explosives used per hole and the order and length of delay in the
blasts; and
(B) Require that all blasting operations be conducted by persons certified by the Division of
MinWing and Reclamation.
(16) Ensure that all reclamation efforts proceed in an environmentally sound manner and as
contemporaneously as practicable with the surface mining operations. Time limits shall be
established by the secretary requiring backfilling, grading and planting to be kept current:
Provided, That where surface mining operations and underground mining operations are
proposed on the same area, which operations must be conducted under separate permits,
the secretary may grant a variance from the requirement that reclamation efforts proceed as
contemporaneously as practicable to permit underground mining operations prior to
reclamation:
(A) If the secretary finds in writing that:
(i) The applicant has presented, as part of the permit application, specific, feasible plans for
the proposed underground mining operations;
(ii) The proposed underground mining operations are necessary or desirable to assure
maximum practical recovery of the mineral resource and will avoid multiple disturbance of
the surface;
(iii) The applicant has satisfactorily demonstrated that the plan for the underground mining
operations conforms to requirements for underground mining in the jurisdiction and that
permits necessary for the underground mining operations have been issuede by the
appropriate authority;
(iv) The areas proposed for the variance have been shown by the applicant to be necessary
for the implementing of the proposed underground mining operautions;
(v) No substantial adverse environmental damage, either on-site or off-site, will result from
the delay in completion of reclamation as required by this article; and
(vi) Provisions for the off-site storage of spoil will comply with subdivision (22), subsection
(b) of this section; l
(B) If the secretary has promulgated specific rules to govern the granting of the variances in
accordance with the provisions of this subiparagraph and has imposed any additional
requirements as the secretary considers necessary;
(C) If variances granted under the provisions of this paragraph are reviewed by the
secretary not more than three years from the date of issuance of the permit: Provided, That
the underground mining permit shall terminate if the underground operations have not
commenced within three years of the date the permit was issued, unless extended as set
forth in subdivision (3), section eight of this article; and
(D) If liability Vunder the bond filed by the applicant with the secretary pursuant to
subsection (b), section eleven of this article is for the duration of the underground mining
operations and until the requirements of subsection (g), section eleven of this article and
section twenty-three of this article have been fully complied with;
(17) Ensure that the construction, maintenance and post-mining conditions of access and
haul roads into and across the site of operations will control or prevent erosion and siltation,
pollution of water, damage to fish or wildlife or their habitat, or public or private property:
Provided, That access roads constructed for and used to provide infrequent service to
surface facilities, such as ventilators or monitoring devices, are exempt from specific
construction criteria provided adequate stabilization to control erosion is achieved through
alternative measures;
(18) Refrain from the construction of roads or other access ways up a stream bed or
drainage channel or in proximity to the channel so as to significantly alter the normal flow of
water;
(19) Establish on the regraded areas, and all other lands affected, a diverse, effective and
permanent vegetative cover of the same seasonal variety native to the area of land to be
affected or of a fruit, grape or berry producing variety suitable for human consumption and
capable of self-regeneration and plant succession at least equal in extent of cover to the
natural vegetation of the area, except that introduced species may be used in the
revegetation process where desirable or when necessary to achieve the approved post-
mining land use plan;
(20) Assume the responsibility for successful revegetation, as required by subdivision (19) of
this subsection, for a period of not less than five growing seasons, as derfined by the
secretary, after the last year of augmented seeding, fertilizing, irrigation or other work in
order to assure compliance with subdivision (19) of this subsection: Provided, That when the
secretary issues a written finding approving a long-term agricultural post-mining land use
as a part of the mining and reclamation plan, the director mtay grant exception to the
provisions of subdivision (19) of this subsection: Provided, however, That when the director
approves an agricultural post-mining land use, the applicable five growing seasons of
responsibility for revegetation begins on the date of initial planting for the agricultural post-
mining land use;
On lands eligible for remining assume the responsibility for successful revegetation, as
required by subdivision (19) of this subsection, for a period of not less than two growing
seasons, as defined by the director agfter the last year of augmented seeding, fertilizing,
irrigation or other work in order to assure compliance with subdivision (19) of this
subsection; e
(21) Protect off-site areaLs from slides or damage occurring during surface mining operations
and not deposit spoil material or locate any part of the operations or waste accumulations
outside the permit area: Provided, That spoil material may be placed outside the permit area
if approved by the secretary after a finding that environmental benefits will result from the
placing of spoil material outside the permit area;
(22W) Place all excess spoil material resulting from surface mining activities in a manner that:
(A) Spoil is transported and placed in a controlled manner in position for concurrent
compaction and in a way as to assure mass stability and to prevent mass movement; (B) the
areas of disposal are within the bonded permit areas and all organic matter is removed
immediately prior to spoil placements; (C) appropriate surface and internal drainage system
or diversion ditches are used to prevent spoil erosion and movement; (D) the disposal area
does not contain springs, natural water courses or wet weather seeps, unless lateral drains
are constructed from the wet areas to the main under drains in a manner that filtration of
the water into the spoil pile will be prevented; (E) if placed on a slope, the spoil is placed
upon the most moderate slope among those upon which, in the judgment of the secretary,
the spoil could be placed in compliance with all the requirements of this article, and is
placed, where possible, upon, or above, a natural terrace, bench or berm, if placement
provides additional stability and prevents mass movement; (F) where the toe of the spoil
rests on a downslope, a rock toe buttress, of sufficient size to prevent mass movement, is
constructed; (G) the final configuration is compatible with the natural drainage pattern and
surroundings and suitable for intended uses; (H) the design of the spoil disposal area is
certified by a qualified registered professional engineer in conformance with professional
standards; and (I) all other provisions of this article are met: Provided, That where the
excess spoil material consists of at least eighty percent, by volume, sandstone, limestone or
other rocks that do not slake in water and will not degrade to soil material, the secretary
may approve alternate methods for disposal of excess spoil material, including fill placement
by dumping in a single lift, on a site-specific basis: Provided, however, That ethe services of a
qualified registered professional engineer experienced in the design and construction of
earth and rockfill embankment are utilized: Provided further, That the rapproval may not be
unreasonably withheld if the site is suitable;
(23) Meet any other criteria necessary to achieve reclamation in accordance with the
purposes of this article, taking into consideration the physictal, climatological and other
characteristics of the site;
(24) To the extent possible, using the best technology currently available, minimize
disturbances and adverse impacts of the operation on fish, wildlife and related
environmental values, and achieve enhancemesnt of these resources where practicable; and
(25) Retain a natural barrier to inhibit slides and erosion on permit areas where outcrop
barriers are required: Provided, Thagt constructed barriers may be allowed where: (A)
Natural barriers do not provide adequate stability; (B) natural barriers would result in
potential future water quality edeterioration; and (C) natural barriers would conflict with the
goal of maximum utilization of the mineral resource: Provided, however, That at a minimum,
the constructed barrier Lshall be of sufficient width and height to provide adequate stability
and the stability factor shall equal or exceed that of the natural outcrop barrier: Provided
further, That where water quality is paramount, the constructed barrier shall be composed
of impervious material with controlled discharge points.
(c)(1) The secretary may prescribe procedures pursuant to which he or she may permit
surWface mining operations for the purposes set forth in subdivision (3) of this subsection.
(2) Where an applicant meets the requirements of subdivisions (3) and (4) of this subsection,
a permit without regard to the requirement to restore to approximate original contour set
forth in subsection (b) or (d) of this section may be granted for the surface mining of coal
where the mining operation will remove an entire coal seam or seams running through the
upper fraction of a mountain, ridge or hill, except as provided in paragraph (A), subdivision
(4) of this subsection, by removing all of the overburden and creating a level plateau or a
gently rolling contour with no highwalls remaining and capable of supporting post-mining
uses in accordance with the requirements of this subsection.
(3) In cases where an industrial, commercial, agricultural, commercial forestry, residential
or public facility including recreational uses is proposed for the post-mining use of the
affected land, the secretary may grant a permit for a surface mining operation of the nature
described in subdivision (2) of this subsection where: (A) The proposed post-mining land use
is determined to constitute an equal or better use of the affected land, as compared with
premining use; (B) the applicant presents specific plans for the proposed post-mining land
use and appropriate assurances that the use will be: (i) Compatible with adjacent land uses;
(ii) practicable with respect to achieving the proposed use; (iii) obtainable according to data
regarding expected need and market; (iv) supported by commitments from public agencies
where appropriate; (v) practicable with respect to private financial capability for completion
of the proposed use; (vi) planned pursuant to a schedule attached to the recelamation plan so
as to integrate the mining operation and reclamation with the post-mining land use; and (vii)
designed by a person approved by the secretary in conformance with srtandards established
to assure the stability, drainage and configuration necessary for the intended use of the site;
(C) the proposed use would be compatible with adjacent land uses, and existing state and
local land use plans and programs; (D) the secretary provides the county commission of the
county in which the land is located and any state or federal atgency which the secretary, in
his or her discretion, determines to have an interest in the proposed use, an opportunity of
not more than sixty days to review and comment on the proposed use; and (E) all other
requirements of this article will be met.
(4) In granting any permit pursuant to this subsection, the secretary shall require that: (A) A
natural barrier be retained to inhibit slides and erosion on permit areas where outcrop
barriers are required: Provided, That constructed barriers may be allowed where: (i) Natural
barriers do not provide adequate stability; (ii) natural barriers would result in potential
future water quality deterioration; and (iii) natural barriers would conflict with the goal of
maximum utilization of the mineeral resource: Provided, however, That, at a minimum, the
constructed barrier shall be sufficient in width and height to provide adequate stability and
the stability factor shallL equal or exceed that of the natural outcrop barrier: Provided
further, That where water quality is paramount, the constructed barrier shall be composed
of impervious materi al with controlled discharge points; (B) the reclaimed area is stable; (C)
the resulting Vplateau or rolling contour drains inward from the outslopes except at specific
points; (D) no damage will be done to natural watercourses; (E) spoil will be placed on the
mountaintop bench as is necessary to achieve the planned post-mining land use: And
provided further, That all excess spoil material not retained on the mountaintop shall be
placed in accordance with the provisions of subdivision (22), subsection (b) of this section;
and (F) ensure stability of the spoil retained on the mountaintop and meet the other
requirements of this article.
(5) All permits granted under the provisions of this subsection shall be reviewed not more
than three years from the date of issuance of the permit; unless the applicant affirmatively
demonstrates that the proposed development is proceeding in accordance with the terms of
the approved schedule and reclamation plan.
(d) In addition to those general performance standards required by this section, when
surface mining occurs on slopes of twenty degrees or greater, or on lesser slopes as may be
defined by rule after consideration of soil and climate, no debris, abandoned or disabled
equipment, spoil material or waste mineral matter will be placed on the natural downslope
below the initial bench or mining cut: Provided, That soil or spoil material from the initial cut
of earth in a new surface mining operation may be placed on a limited specified area of the
downslope below the initial cut if the permittee can establish to the satisfaction of the
secretary that the soil or spoil will not slide and that the other requirements of this section
can still be met.
(e) The secretary may propose rules for legislative approval in accordance with article three,
chapter twenty-nine-a of this code that permit variances from the approximaete original
contour requirements of this section: Provided, That the watershed control of the area is
improved: Provided, however, That complete backfilling with spoil materrial is required to
completely cover the highwall, which material will maintain stability following mining and
reclamation.
(f) The secretary shall propose rules for legislative approval tin accordance with article three,
chapter twenty-nine-a of this code for the design, location, construction, maintenance,
operation, enlargement, modification, removal and abandonment of new and existing coal
mine waste piles. In addition to engineering and other technical specifications, the standards
and criteria developed pursuant to this subsection shall include provisions for review and
approval of plans and specifications prior to csonstruction, enlargement, modification,
removal or abandonment; performance of periodic inspections during construction; issuance
of certificates of approval upon completion of construction; performance of periodic safety
inspections; and issuance of noticesg and orders for required remedial or maintenance work
or affirmative action: Provided, That whenever the secretary finds that any coal processing
waste pile constitutes an immienent danger to human life, he or she may, in addition to all
other remedies and without the necessity of obtaining the permission of any person prior or
present who operated oLr operates a pile or the landowners involved, enter upon the
premises where any coal processing waste pile exists and may take or order to be taken any
remedial action that may be necessary or expedient to secure the coal processing waste pile
and to abate the conditions which cause the danger to human life: Provided, however, That
the cost reasonably incurred in any remedial action taken by the secretary under this
subsection may be paid for initially by funds appropriated to the division for these purposes
and the sums expended shall be recovered from any responsible operator or landowner,
individually or jointly, by suit initiated by the Attorney General at the request of the
secretary. For purposes of this subsection, operates or operated means to enter upon a coal
processing waste pile, or part of a coal processing waste pile, for the purpose of disposing,
depositing, dumping coal processing wastes on the pile or removing coal processing waste
from the pile, or to employ a coal processing waste pile for retarding the flow of or for the
impoundment of water.
(g) The secretary shall promulgate for review and consideration by the West Virginia
Legislature during the 2017 Regular Session of the West Virginia Legislature revisions to the
rules for minimizing the disturbances to the prevailing hydrologic balance at a mine site and
in associated off-site areas both during and after surface mining operations and during
reclamation as required under subdivision (10), subsection (b) of this section, including
specifically the rules for stormwater runoff and control plans. The secretary shall
specifically conform these rules to the federal standards codified at 30 C.F.R. §816.41 (1983)
and 30 C.F.R. §816.45-47 (1983) when proposing revisions to the state rule. The secretary
shall not propose rules more stringent than the federal standards codified at 30 C.F.R.
§816.41 (1983) and 30 C.F.R. §816.45-47 (1983) when proposing revisions to the state rule.

‹ Prev All West Virginia sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.