Utah Code § 19-3-105

Definitions -- Legislative and gubernatorial approval required for radioactive waste
Open in Lexace · Ask the AI about this section
license -- Exceptions -- Application for new, renewed, or amended license.
(1) As used in this section:
(a) "Alternate feed material" has the same definition as provided in Section 59-24-102.
(b) "Approval application" means an application by a radioactive waste facility regulated under
this chapter or Title 19, Chapter 5, Water Quality Act, for a permit, license, registration,
certification, or other authorization.
(c)
(i) "Class A low-level radioactive waste" means:
(A) radioactive waste that is classified as class A waste under 10 C.F.R. 61.55; and
(B) radium-226 up to a maximum radionuclide concentration level of 10,000 picocuries per
gram.
(ii) "Class A low-level radioactive waste" does not include:
(A) uranium mill tailings;
(B) naturally occurring radioactive materials; or
(C) the following radionuclides if classified as "special nuclear material" under the Atomic
Energy Act of 1954, 42 U.S.C. 2014:
(I) uranium-233; and
(II) uranium-235 with a radionuclide concentration level greater than the concentration
limits for specific conditions and enrichments established by an order of the Nuclear
Regulatory Commission:
(Aa) to ensure criticality safety for a radioactive waste facility in the state; and
(Bb) in response to a request, submitted prior to January 1, 2004, from a radioactive
waste facility in the state to the Nuclear Regulatory Commission to amend the facility's
special nuclear material exemption order.
(d)
(i) "Radioactive waste facility" or "facility" means a facility that decays radioactive waste in
storage, treats radioactive waste, or disposes of radioactive waste:
(A) commercially for profit; or
(B) generated at locations other than the radioactive waste facility.
(ii) "Radioactive waste facility" does not include a facility that receives:
(A) alternate feed material for reprocessing; or
(B) radioactive waste from a location in the state designated as a processing site under 42
U.S.C. 7912(f).

(e) "Radioactive waste license" or "license" means a radioactive material license issued by the
director to own, construct, modify, or operate a radioactive waste facility.
(2) The provisions of this section are subject to the prohibition under Section 19-3-103.7.
(3) Subject to Subsection (8), a person may not own, construct, modify, or operate a radioactive
waste facility without:
(a) having received a radioactive waste license for the facility;
(b) meeting the requirements established by rule under Section 19-3-104;
(c) the approval of the governing body of the municipality or county responsible for local planning
and zoning where the radioactive waste is or will be located; and
(d) subsequent to meeting the requirements of Subsections (3)(a) through (c), the approval of the
governor and the Legislature.
(4) Subject to Subsection (8), a new radioactive waste license application, or an application
to renew or amend an existing radioactive waste license, is subject to the requirements of
Subsections (3)(b) through (d) if the application, renewal, or amendment:
(a) specifies a different geographic site than a previously submitted application;
(b) would cost 50% or more of the cost of construction of the original radioactive waste facility
or the modification would result in an increase in capacity or throughput of a cumulative
total of 50% of the total capacity or throughput which was approved in the facility license
as of January 1, 1990, or the initial approval facility license if the initial license approval is
subsequent to January 1, 1990; or
(c) requests approval to decay radioactive waste in storage, treat radioactive waste, or dispose
of radioactive waste having a higher radionuclide concentration limit than allowed, under an
existing approved license held by the facility, for the specific type of waste to be decayed in
storage, treated, or disposed of.
(5) The requirements of Subsection (4)(c) do not apply to an application to renew or amend an
existing radioactive waste license if:
(a) the radioactive waste facility requesting the renewal or amendment has received a license
prior to January 1, 2004; and
(b) the application to renew or amend its license is limited to a request to approve the receipt,
transfer, storage, decay in storage, treatment, or disposal of class A low-level radioactive
waste.
(6) A radioactive waste facility that receives a new radioactive waste license after May 3, 2004,
is subject to the requirements of Subsections (3)(b) through (d) for any license application,
renewal, or amendment that requests approval to decay radioactive waste in storage, treat
radioactive waste, or dispose of radioactive waste not previously approved under an existing
license held by the facility.
(7) If the board finds that approval of additional radioactive waste license applications, renewals,
or amendments will result in inadequate oversight, monitoring, or licensure compliance and
enforcement of existing and any additional radioactive waste facilities, the board shall suspend
acceptance of further applications for radioactive waste licenses. The board shall report the
suspension to the Legislative Management Committee.
(8) The requirements of Subsections (3)(c) and (d) and Subsection 19-3-104(10) do not apply to:
(a) a radioactive waste license in effect on December 31, 2006, including all amendments to the
license thereafter;
(b) a license application for a facility in existence as of December 31, 2006, unless the license
application includes an area beyond the facility boundary approved in the license described in
Subsection (8)(a); or

(c) an application to renew or amend a license described in Subsection (8)(a), if the renewal or
amendment includes an area:
(i) within the facility boundary approved in the license described in Subsection (8)(a); or
(ii) within a hazardous waste corridor.
(9)
(a) The director shall review an approval application to determine whether the application
complies with the requirements of this chapter and the rules of the board.
(b) Within 60 days after the day on which the director receives an approval application described
in Subsection (10)(a)(ii) or (iii), the director shall:
(i) determine whether the application is complete and contains all the information necessary to
process the application for approval; and
(ii)
(A) issue a notice of completeness to the applicant; or
(B) issue a notice of deficiency to the applicant and list the additional information necessary to
complete the application.
(c) The director shall review information submitted in response to a notice of deficiency within 30
days after the day on which the director receives the information.
(10) The board shall make rules, in accordance with Title 63G, Chapter 3, Utah Administrative
Rulemaking Act, to:
(a) categorize approval applications as follows:
(i) approval applications that:
(A) are administrative in nature;
(B) require limited scrutiny by the director; and
(C) do not require public input;
(ii) approval applications that:
(A) require substantial scrutiny by the director;
(B) require public input; and
(C) are not described in Subsection (10)(a)(iii); and
(iii) approval applications for:
(A) the granting or renewal of a radioactive waste license;
(B) the granting or renewal of a groundwater permit issued by the director for a radioactive
waste facility;
(C) an amendment to a radioactive waste license, or a groundwater permit, that allows the
design and approval of a new disposal cell;
(D) an amendment to a radioactive waste license or groundwater discharge permit for a
radioactive waste facility to eliminate groundwater monitoring; and
(E) a radioactive waste facility closure plan;
(b) provide time periods for the director to review, and approve or deny, an application described
in Subsection (10)(a) as follows:
(i) for applications categorized under Subsection (10)(a)(i), within 30 days after the day on
which the director receives the application; and
(ii) for applications categorized under Subsection (10)(a)(ii), within 180 days after the day on
which the director receives the application;
(iii) for applications categorized under Subsection (10)(a)(iii), as follows:
(A) for a new radioactive waste license, within 540 days after the day on which the director
receives the application;

(B) for a new groundwater permit issued by the director for a radioactive waste facility
consistent with the provisions of Title 19, Chapter 5, Water Quality Act, within 540 days
after the day on which the director receives the application;
(C) for a radioactive waste license renewal, within 365 days after the day on which the
director receives the application;
(D) for a groundwater permit renewal issued by the director for a radioactive waste facility,
within 365 days after the day on which the director receives the application;
(E) for an amendment to a radioactive waste license, or a groundwater permit, that allows
the design and approval of a new disposal cell, within 365 days after the day on which the
director receives the application;
(F) for an amendment to a radioactive waste license, or a groundwater discharge permit, for
a radioactive waste facility to eliminate groundwater monitoring, within 365 days after the
day on which the director receives the application; and
(G) for a radioactive waste facility closure plan, within 365 days after the day on which the
director receives the application;
(c) toll the time periods described in Subsection (10)(b):
(i) while an owner or operator of a facility responds to the director's request for information;
(ii) during a public comment period; or
(iii) while the federal government reviews the application; and
(d) require the director to prepare a detailed written explanation of the basis for the director's
approval or denial of an approval application.