Nevada Code § 624.3011

Disregard of plans, specifications, laws or regulations
Open in Lexace · Ask the AI about this section
1. The following acts, among others,
constitute cause for disciplinary action under NRS 624.300 :
(a) Willful and prejudicial departure from or
disregard of plans or specifications in any material respect without the
consent of the owner or the owners authorized representative and the person
entitled to have the particular construction project or operation completed in
accordance with the plans and specifications.
(b) Willful or deliberate disregard and violation
of:
(1) The building laws of the State or of
any political subdivision thereof.
(2) The safety laws or labor laws of the
State.
(3) Any provision of the Nevada health and
safety laws or the regulations adopted thereunder relating to the digging,
boring or drilling of water wells.
(4) The laws of this State regarding
industrial insurance.
2. If a contractor performs construction
without obtaining any necessary building permit, there is a rebuttable
presumption that the contractor willfully and deliberately violated the
building laws of this State or of its political subdivisions.