Nevada Code § 543.110

Contents of petition for loan; repayment period; budgets
Open in Lexace · Ask the AI about this section
1. Each petition to the Director must
describe the proposed flood control project or riparian survey, state the
amount of money requested, and designate the areas to be assessed to reimburse
the Flood Control Account.
2. The Director shall determine the period
to be allowed for repayment of the money loaned, which period may not be longer
than 5 years from the date of the loan.
3. The Director shall, between the first
Monday of October and the first Monday of December of each year following the
date of any loan, prepare a budget based on repayment of the loan in equal
annual installments showing the amount of money to be repaid in the next
succeeding fiscal year, and shall submit the budget to the board of county
commissioners of the county in which the project or survey is located. If the
project or survey is located in more than one county, separate budgets must be
prepared for each county.

‹ Prev All Nevada sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.