Nevada Code § 533.504

Temporary permit regarding appropriation to water livestock: Application; approval; duration
Open in Lexace · Ask the AI about this section
1. Except as otherwise provided in NRS 533.495 and 533.503 , a person may apply for a temporary
permit to appropriate groundwater to water livestock if the point of diversion
is located within a county under a declaration of drought, or within a county
contiguous to a county under such a declaration, by the:
(a) Governor;
(b) United States Secretary of Agriculture; or
(c) President of the United States.
2. In addition to the information required
by NRS 533.335 and 533.340 , an applicant for a temporary
permit to appropriate groundwater pursuant to this section shall submit to the
State Engineer:
(a) An affidavit stating that, if the temporary
permit is for a well, the holder of the temporary permit will plug and seal the
well pursuant to chapter 534 of NRS upon the
expiration of the temporary permit; and
(b) Any other information required by the State
Engineer to determine the necessity of the temporary appropriation.
3. The State Engineer shall approve an
application for a temporary permit to appropriate groundwater pursuant to this
section if:
(a) The application is accompanied by the fee
prescribed by this chapter;
(b) The temporary appropriation is in the public
interest; and
(c) The temporary appropriation does not impair
water rights held by other persons.
4. A temporary permit to appropriate
groundwater issued pursuant to this section must not exceed 1 year in duration.