Maryland Code § PU-7-306

Section PU-7-306
Open in Lexace · Ask the AI about this section
(a) (1) In this section the following words have the meanings indicated.
(2) "Biomass" means "qualified biomass" as defined in § 7-701 of this
title.
(3) "Closed conduit hydro" means a hydroelectric generating facility
that:
(i) generates electricity within existing piping or limited
adjacent piping of a potable water supply system;
(ii) is owned or operated by a municipal corporation or public
water authority; and
(iii) is designed to produce less energy than is consumed to
operate the water supply system.
(4) "Eligible customer-generator" means a customer that owns and
operates, leases and operates, or contracts with a third party that owns and operates
a biomass, micro combined heat and power, solar, fuel cell, wind, or closed conduit
hydro electric generating facility that:
(i) is located on the customer's premises or contiguous
property;
(ii) is interconnected and operated in parallel with an electric
company's transmission and distribution facilities; and
(iii) is intended primarily to offset all or part of the customer's
own electricity requirements.
(5) "Fuel cell" means an electric generating facility that:

(i) includes integrated power plant systems containing a
stack, tubular array, or other functionally similar configuration used to
electrochemically convert fuel to electric energy; and
(ii) may include:
1. an inverter and fuel processing system; and
2. other plant equipment to support the plant's
operation or its energy conversion, including heat recovery equipment.
(6) "Micro combined heat and power" means the simultaneous or
sequential production of useful thermal energy and electrical or mechanical power
not exceeding 30 kilowatts.
(7) "Net energy metering" means measurement of the difference
between the electricity that is supplied by an electric company and the electricity that
is generated by an eligible customer-generator and fed back to the electric grid over
the eligible customer-generator's billing period.
(8) "Net excess generation" means the amount of the electricity
generated by an eligible customer-generator that is in excess of the electricity
consumed by the eligible customer-generator and that results in a negative kilowatt-
hour reading at the end of the eligible customer-generator's billing cycle.
(b) The General Assembly finds and declares that a program to provide net
energy metering for eligible customer-generators is a means to encourage private
investment in renewable energy resources, stimulate in-State economic growth,
enhance continued diversification of the State's energy resource mix, and reduce costs
of interconnection and administration.
(c) An electric company serving an eligible customer-generator shall
ensure that the meter installed for net energy metering is capable of measuring the
flow of electricity in two directions.
(d) The Commission shall require electric utilities to develop a standard
contract or tariff for net energy metering and make it available to eligible customer-
generators on a first-come, first-served basis until the rated generating capacity
owned and operated by eligible customer-generators in the State reaches 3,000
megawatts.
(e) (1) A net energy metering contract or tariff shall be identical, in
energy rates, rate structure, and monthly charges, to the contract or tariff that the
customer would be assigned if the customer were not an eligible customer-generator.

(2) (i) A net energy metering contract or tariff may not include
charges that would raise the eligible customer-generator's minimum monthly charge
above that of customers of the rate class to which the eligible customer-generator
would otherwise be assigned.
(ii) Charges prohibited by this paragraph include new or
additional demand charges, standby charges, customer charges, and minimum
monthly charges.
(f) (1) The electric company shall calculate net energy metering in
accordance with this subsection.
(2) Net energy produced or consumed on a regular basis shall be
measured in accordance with standard metering practices.
(3) If electricity supplied by the grid exceeds electricity generated by
the eligible customer-generator during a month, the eligible customer-generator
shall be billed for the net energy supplied in accordance with subsection (e) of this
section.
(4) If electricity generated by the eligible customer-generator
exceeds the electricity supplied by the grid, the eligible customer-generator shall be
billed only customer charges for that month in accordance with subsection (e) of this
section.
(5) (i) An eligible customer-generator under paragraph (4) of this
subsection may:
1. accrue net excess generation for a period:
A. not to exceed 12 months; and
B. that ends with the billing cycle that is complete
immediately prior to the end of April of each year; or
2. except for an eligible customer-generator served by
a municipal electric utility or an electric cooperative and subject to subparagraph (iv)
of this paragraph, accrue net excess generation for an indefinite period regardless of
whether the eligible customer-generator previously accrued net excess generation for
a period authorized under item 1 of this subparagraph.
(ii) The electric company shall carry forward net excess
generation until:

1. the eligible customer-generator's consumption of
electricity from the grid eliminates the net excess generation;
2. the accrual period under subparagraph (i)1 of this
paragraph expires; or
3. the account is closed.
(iii) 1. If an eligible customer-generator elects to accrue net
excess generation for a period not to exceed 12 months under subparagraph (i)1 of
this paragraph, the dollar value of net excess generation shall be equal to the
generation or commodity portion of the rate that the eligible customer-generator
would have been charged by the electric company averaged over the previous 12-
month period ending with the billing cycle that is complete immediately before the
end of April multiplied by the number of kilowatt-hours of net excess generation.
2. For an eligible customer-generator that elects to
accrue net excess generation under subparagraph (i)1 of this paragraph and is served
by a community choice aggregator or an electricity supplier, the dollar value of the
net excess generation shall be equal to the generation or commodity rate that the
customer would have been charged by the community choice aggregator or electricity
supplier multiplied by the number of kilowatt-hours of net excess generation.
(iv) If an eligible customer-generator elects to accrue net
excess generation for an indefinite period under subparagraph (i)2 of this paragraph:
1. the eligible customer-generator may not elect to
switch to accruing net excess generation under subparagraph (i)1 of this paragraph
unless the electric company approves the switch; and
2. the electric company shall, within 15 days after an
eligible customer-generator's account is closed, pay the eligible customer-generator,
in accordance with subparagraph (v) of this paragraph, for any accrued net excess
generation remaining at the time the account is closed.
(v) The Commission shall establish a method for calculating
the value of any accrued net excess generation that a customer-generator elects to
accrue for an indefinite period under subparagraph (i)2 of this paragraph.
(6) (i) If an eligible customer-generator elects to accrue net
excess generation under paragraph (5)(i)1 of this subsection, on or before 30 days
after the billing cycle that is complete immediately prior to the end of April of each
year, the electric company shall pay the eligible customer-generator for the dollar

value of any accrued net excess generation remaining at the end of the previous 12-
month period ending with the billing cycle that is complete immediately before the
end of April.
(ii) Within 15 days after the date an eligible customer-
generator that elects to accrue net excess generation under paragraph (5)(i)1 of this
subsection closes the eligible customer-generator's account, the electric company
shall pay the eligible customer-generator for the dollar value of any accrued net
excess generation remaining at the time the eligible customer-generator closes the
account.
(7) (i) Notwithstanding paragraphs (5) and (6) of this subsection,
an eligible customer-generator served by an electric cooperative that serves a
population of less than 250,000 in its distribution territory may choose to be paid for
the dollar value of net excess generation remaining at the end of each month instead
of at the end of the accrual period specified under paragraph (5)(i)1 of this subsection.
(ii) If an eligible customer-generator chooses to be paid for the
dollar value of net excess generation remaining at the end of each month:
1. the customer-generator may accrue net excess
generation on a monthly basis;
2. the dollar value of the net excess generation shall be
equal to the generation or commodity portion of the rate that the eligible customer-
generator would have been charged by the electric company for the previous month;
and
3. on or before 30 days after the end of each month, the
electric cooperative shall pay the eligible customer-generator for the dollar value of
net excess generation remaining at the end of the previous month.
(g) (1) Except as provided in paragraphs (6), (7), and (8) of this
subsection, the generating capacity of an electric generating system used by an
eligible customer-generator for net metering may not exceed 2 megawatts.
(2) An electric generating system used by an eligible customer-
generator for net metering shall meet all applicable safety and performance
standards established by the National Electrical Code, the Institute of Electrical and
Electronics Engineers, and Underwriters Laboratories.
(3) The Commission may adopt by regulation additional control and
testing requirements for eligible customer-generators that the Commission
determines are necessary to protect public safety and system reliability.

(4) An electric company may not require an eligible customer-
generator whose electric generating system meets the standards of paragraphs (2)
and (3) of this subsection to:
(i) install additional controls;
(ii) perform or pay for additional tests; or
(iii) purchase additional liability insurance.
(5) An eligible customer-generator or the eligible customer-
generator's assignee shall own and have title to all renewable energy attributes or
renewable energy credits associated with any electricity produced by its electric
generating system.
(6) The Commission may not prohibit the construction or operation
of multiple net metered solar energy generating facilities located on separate
contiguous lots that are owned by a local government solely because the capacity of
the combined net metering systems exceeds the limit established under paragraph
(1) of this subsection, if:
(i) the net metered solar energy generating facilities are
intended to be used solely for the benefit of the local government;
(ii) the total capacity of the net metered solar energy
generating facilities on the contiguous lots does not exceed 5 megawatts;
(iii) the contiguous lots were not subdivided for the purpose of
circumventing the limit established under paragraph (1) of this subsection; and
(iv) the utility serving the net metered solar energy generating
facilities is not an electric cooperative or municipal electric utility.
(7) The generating capacity of a community solar energy generating
system established under § 7-306.2 of this subtitle that is used for net metering may
not exceed 5 megawatts.
(8) The generating capacity of a net metered facility that is meter
aggregated under § 7-306.3 of this subtitle may not exceed 5 megawatts.
(h) An eligible customer-generator participating in net energy metering
may participate in the aggregation activities of a community choice aggregator under
§ 7-510.3 of this title.

(i) Notwithstanding the generating capacity limits established in
subsection (g) of this section, an eligible customer-generator participating in meter
aggregation under § 7-306.2 or § 7-306.3 of this subtitle may receive excess
generation from more than one generating system, including if the combined
generating capacity of all net metered facilities that are meter aggregated exceeds 5
megawatts.
(j) On or before November 1 of each year, the Commission shall report to
the General Assembly, in accordance with § 2-1257 of the State Government Article,
on the status of the net metering program under this section, including:
(1) the amount of capacity of electric generating facilities owned and
operated by eligible customer-generators in the State by type of energy resource;
(2) based on the need to encourage a diversification of the State's
energy resource mix to ensure reliability, whether the rated generating capacity limit
in subsection (d) of this section should be altered; and
(3) other pertinent information.