Iowa Code § 572.14

Liability to subcontractor after payment to general contractor or owner-builder
Open in Lexace · Ask the AI about this section
Except as provided in section 572.13B, payment to the general contractor or owner-builder of any part or all of the contract price of the building or improvement within ninety days after the date on which the last of the materials was furnished or the last of the labor was performed by a subcontractor, does not relieve the owner from liabilityto the subcontractor for the full value of any material furnished or labor performed upon the building, land, or improvement ifthe subcontractor posts a lien within ninety days after the date on which the lastof the materials was furnished or the last of the labor was performed. [S13, §3093; C24, 27, 31, 35, 39, §10283; C46, 50, 54, 58, 62, 66, 71, 73, 75, 77, 79, 81, §572.14; 81 Acts, ch 186, §2] 28; 2012 Acts, ch 1138, §13

‹ Prev All Iowa sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.