Iowa Code § 572.13B

Preliminary notice — subcontractor — residential construction
Open in Lexace · Ask the AI about this section
1. A subcontractor shall post a preliminary notice to the mechanics’ notice and lien registry internet site. A preliminary notice posted before the balance due is paid to the general contractor or the owner-builder is effective as to all labor, service, equipment, and material furnished to the property by the subcontractor. The preliminary notice shall contain allof the following information: a. The name of the owner. b. The mechanics’ notice and lien registry number. c. The name, address, and telephone number of the subcontractor furnishing the labor, service, equipment, or material. d. The name and address of the person who contracted with the claimant for the furnishing of the labor, service, equipment, or material. e. The name of the general contractor or owner-builder under which the claimant is performing or will perform the work. f. The address of theproperty or a description ofthe location ofthe property ifthe property cannot be reasonably identified by an address. g. The legal description that adequately describes the property to be charged with the lien. h. The date the material or materials were first furnished or the labor was firstperformed. i. The tax parcel identification number. j. Any other information required by the administrator pursuant to rule. 2. At the time a preliminary notice is posted to the mechanics’ notice and lien registry internet site, the administrator shall send notification to the owner, including the ownernotice described in section 572.13, subsection 1, and shall post the mailing of the notice on the mechanics’ notice and lien registry internet siteas prescribed by the administrator pursuant to rule. Notices under this section shall not be sent to owner-builders. Upon request, the administrator shall provide proof of service at no cost for the notice required under this section. 3. a. A mechanic’s lien perfected under this chapter isenforceable only to the extent of the balance due the general contractor or the owner-builder at the time of the posting of the preliminary notice specifiedin subsection 1, and, except for residential construction property owned by an owner-builder, also is enforceable only to the extent of the balance due the general contractor at the time the owner actually receives the notice provided pursuant to subsection 2 or paragraph “b”. b. (1) In any action to enforce a mechanic’s lien perfected under this chapter against the owner, the subcontractor bears the burden to prove by a preponderance of the evidence that the owner received notice pursuant to subsection 2. A subcontractor may satisfy the burden 7 MECHANIC’S LIEN, §572.16 of proof by providing separate notice to an owner by including but not limited to any of the following means: (a) By certified mail with return receipt. (b) By personal service in the manner original notices are required to be served. (c) By actual notice with a signed receipt from the owner acknowledging notice. (2) Ifthe subcontractor provides an affidavitof mailing, the presumption isthat the owner received the notice on the fourth day of business for the post office after the notice was sent and the burden of proof shifts from the subcontractor to the owner to refute the presumption. 4. A subcontractor who failsto post a preliminary notice pursuant to this section shall not be entitled to a lien and remedy provided under this chapter. 5. This section applies only to residential construction properties. Acts, ch 99, §6, 7; 2014 Acts, ch 1092, §127

‹ Prev All Iowa sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.