Colorado Code § 25-8-205.1

State waters protection - applicability - program to regulate the discharge of dredged or fill material - duties of commission and division - applicability and scope of section - legislative declaration - definitions - rules - repeal
Open in Lexace · Ask the AI about this section
(1) Legislative
declaration. (a) The general assembly finds that:
(I) On May 25, 2023, the United States supreme court issued an opinion in Sackett v.
Environmental Protection Agency, 598 U.S. 651 (2023), that interpreted the types of water
resources that are considered to be "waters of the United States", which are subject to federal
permitting requirements under section 404 of the federal "Clean Water Act", Pub.L. 92-500,
codified at 33 U.S.C. sec. 1251 et seq., as amended, for the discharge of dredged or fill material.
The Sackett ruling became immediately effective in Colorado, and the federal environmental
protection agency and the United States Army corps of engineers subsequently published new
regulations seeking to conform to the Sackett ruling. As a result, federal permitting requirements
for the discharge of dredged or fill material no longer apply to certain state waters, including
many wetlands.
(II) As of March 2024, Colorado has not had a state program to authorize the discharge
of dredged or fill material into state waters and has instead relied on the United States Army
corps of engineers section 404 permit program. The new definition of "waters of the United
States" under Sackett, which narrows federal jurisdiction in this area, has created a need for a
state dredge and fill program. With fewer federal discharge permits being issued by the United
States Army corps of engineers following Sackett, many streams, lakes, and wetlands in
Colorado are at risk of irreversible harm.
(III) Some projects involving the discharge of dredged or fill material, such as those for
flood control; stream restoration; water development; construction or maintenance of
underground utilities, roads, transit, rail, and housing; and similar efforts that are no longer
regulated by the federal act as a result of Sackett, face regulatory uncertainty unless Colorado
develops its own dredge and fill program; and
(IV) The department of public health and environment led stakeholder efforts during
2023 that focused on regulatory options to address the Sackett decision, and the provisions of
this section directly reflect the input received during these efforts concerning exempted activities
and excluded types of waters.
(b) The general assembly further finds that:
(I) Water is Colorado's most critical natural resource, and safeguarding water quality is
of paramount importance for the protection of public health and Colorado's environment;
(II) Colorado's wetlands and seasonal streams play a crucial role in maintaining water
quality for drinking water and wildlife habitats, recharging groundwater, controlling floods, and
keeping pollution from entering larger bodies of water;
(III) Given the crucial role that wetlands play in protecting Colorado's water resources, it
is in the state's interest to expressly include "wetlands" as a category of "state waters" in the
definition of that term used in this article 8. This clarification is consistent with and reiterates the
department of public health and environment's longstanding recognition through rules and
program implementation that wetlands are state waters deserving of protection under this article
8.
(IV) Developing a state dredge and fill program will benefit the entities that wish to
engage in dredge and fill projects within Colorado because, without a discharge authorization
framework, those projects will be prohibited to the detriment of Colorado's economy and general
welfare;
(V) A state dredge and fill program can provide a mechanism for protecting the
chemical, physical, and biological integrity of Colorado's water resources while facilitating a
strong and prosperous economy; and
(VI) Notwithstanding the narrower scope of waters protected at the federal level after the
Sackett decision, the United States Army corps of engineers' section 404 permit program
provides a well-established and protective framework upon which Colorado should model its
own dredge and fill program.
(c) Now, therefore, the general assembly declares that:
(I) This section is necessary to establish a comprehensive dredge and fill program to
protect state waters, no matter how the federal term "waters of the United States" is defined in
the future; and
(II) For the purpose of providing clarification concerning the limitations on the scope of
Colorado's dredge and fill program going forward, the program established in this section
includes:
(A) Express exemptions for certain types of activities that are not subject to dredge and
fill program requirements; and
(B) Express exclusions for certain types of waters that may otherwise fall under the
definition of "state waters".
(2) Applicability - limitations. Nothing in this section applies to the activities of
federally recognized Indian tribes, Indians, their political subdivisions, or tribally controlled
affiliates, which activities are undertaken or to be undertaken on lands within the boundaries of
an Indian reservation located within the state. Additionally, nothing in this section applies to the
activities of third-party non-Indian owners and operators, which activities are undertaken or to
be undertaken with respect to reservation waters on Indian trust lands within the boundaries of
an Indian reservation located within the state. With regard to privately owned fee land, as
defined in section 25-7-1302 (4), within the boundaries of an Indian reservation located within
the state, this section applies only to the discharge of dredged or fill materials of persons who are
not Indians.
(3) Definitions. As used in this section, unless the context otherwise requires:
(a) "Clean Water Policy 17" means the division's Clean Water Policy 17, "Enforcement
of Unpermitted Discharges of Dredged and Fill Material into State Waters".
(b) "Compensatory mitigation" means the restoration, reestablishment, rehabilitation,
establishment, creation, enhancement, or preservation of state waters for the purpose of
offsetting unavoidable adverse impacts that remain after all appropriate and practicable
avoidance and minimization has been achieved.
(c) "Consultation" means to give a federal, state, local, or tribal entity the opportunity to
provide special expertise to authorization processes and technical groups, act as a cooperating
agency, or engage as mutually agreed by the division and the entity.
(d) (I) "Discharge of dredged or fill material" means, except as described in subsection
(3)(d)(II) of this section, any addition of dredged or fill material into, including redeposit of
dredged or fill material other than incidental fallback within, state waters. The term includes:
(A) The addition of dredged or fill material to a specified discharge site located in state
waters;
(B) Runoff or overflow from a contained land or water disposal area; and
(C) Any addition, including redeposit other than incidental fallback, of dredged or fill
material into state waters that is incidental to any activity, including mechanized land clearing,
ditching, channelization, or other excavation.
(II) "Discharge of dredged or fill material" does not include:
(A) Discharges of pollutants into state waters resulting from the onshore processing of
dredged material that is extracted for any commercial use other than fill, which discharges are
subject to section 402 of the federal act, even though the extraction and deposit of such material
may require a section 404 permit or an authorization issued pursuant to this section;
(B) Activities that involve only the cutting or removing of vegetation above the ground,
such as mowing, rotary cutting, and chainsawing, so long as the activity neither substantially
disturbs the vegetation's root system nor involves mechanized pushing, dragging, or other similar
activities that redeposit excavated soil material; or
(C) Incidental fallback.
(e) (I) "Discharge of fill material" means, except as described in subsection (3)(e)(II) of
this section, the addition of fill material into state waters. The term includes:
(A) Placement of fill material that is necessary for the construction of any structure or
infrastructure in state waters;
(B) The building of any structure, infrastructure, or impoundment requiring rock, sand,
dirt, or other material for its construction;
(C) Site development fills for recreational, industrial, commercial, residential, or other
uses;
(D) Causeways or road fills;
(E) Dams and dikes;
(F) Artificial islands;
(G) Property protection or reclamation devices such as riprap;
(H) Levees;
(I) Placement of fill material for infrastructure such as sewage treatment facilities, intake
and outfall pipes associated with power plants, and subaqueous utility lines;
(J) Placement of fill material for construction or maintenance of any liner, berm, or other
infrastructure associated with solid waste landfills; and
(K) Placement of overburden, slurry, tailings, or similar mining-related materials.
(II) "Discharge of fill material" does not include:
(A) Plowing, cultivating, seeding, or harvesting for the production of food, fiber, or
forest products; or
(B) Placement of pilings in state waters, unless the placement has or would have the
effect of a discharge of fill material. Placement of pilings for linear projects, such as bridges,
elevated walkways, and power line structures, generally does not have the effect of a discharge
of fill material. Furthermore, placement of pilings in state waters for a pier, a wharf, or an
individual house on stilts generally does not have the effect of a discharge of fill material.
Examples of activities that would have the effect of a discharge of fill material include projects
where the pilings are so closely spaced that sedimentation rates would be increased, projects in
which the pilings themselves effectively would replace the bottom of a body of state waters,
projects involving the placement of pilings that would reduce the reach or impair the flow or
circulation of state waters, and projects involving the placement of pilings that would result in
the adverse alteration or elimination of aquatic functions.
(f) "Drainage ditch" means a ditch that is designed for at least the partial purpose of
increasing drainage of a particular land area or infrastructure for purposes including agriculture;
transportation, including roadside and railroad transportation; mosquito abatement; and
stormwater management.
(g) "Dredge and fill activity" means an activity that includes the discharge of dredged or
fill material.
(h) "Dredge and fill program" means the regulatory dredge and fill discharge
authorization program described by this section, including the rules promulgated by the
commission, as administered by the division pursuant to this section.
(i) "Dredged material" means material that is excavated or dredged from state waters.
(j) "Dredged or fill material" means dredged material or fill material.
(k) "Ecological lift" means an improvement in the biological health, as well as the
chemical, geomorphic, or hydrologic health, of an area that has been damaged, degraded, or
destroyed.
(l) "Fens or peatlands" means wetlands with organic soil that are classified as a histosol
in the guidance document titled "Field Indicators of Hydric Soils in the United States" published
by the federal natural resources conservation service.
(m) (I) "Fill material" means, except as described in subsection (3)(m)(III) of this
section, material placed in state waters where the material has the effect of:
(A) Replacing any portion of state waters with upland; or
(B) Changing the bottom elevation of any portion of any state waters.
(II) "Fill material" includes rock, sand, soil, clay, plastics, construction debris, wood
chips, overburden from mining or other excavation activities, and materials used to create any
structure or infrastructure in state waters.
(III) "Fill material" does not include solid waste.
(n) "Isolated ordinary high watermark reaches" means reaches of state waters with an
ordinary high watermark that are bordered upstream and downstream by uplands.
(o) "Isolated ponds and impoundments" means ponds and impoundments that are not
within the one-hundred-year floodplain or within one thousand five hundred feet of an ordinary
high watermark of other state waters. In the absence of one-hundred-year floodplain mapping by
the federal emergency management agency, the one thousand five hundred feet distance criterion
applies.
(p) "Isolated wetlands" means wetlands wholly surrounded by uplands. "Isolated
wetlands" does not include wetlands where any portion of the wetland is within the one-hundred-
year floodplain or within one thousand five hundred feet of the ordinary high watermark of other
state waters. In the absence of one-hundred-year floodplain mapping by the federal emergency
management agency, the one thousand five hundred feet distance criterion applies.
(q) "Kettle ponds" means lakes, ponds, or wetlands located within a formerly glaciated
landscape and formed by ice blocks left by a retreating glacier.
(r) "Ordinary high watermark" means that line on the shore established by the
fluctuations of water and indicated by physical characteristics, such as:
(I) A clear, natural line impressed on the bank;
(II) Shelving;
(III) Changes in the character of soil;
(IV) Destruction of terrestrial vegetation;
(V) The presence of litter and debris; or
(VI) Other appropriate means that consider the characteristics of the surrounding area.
(s) "Section 404 permit" means a permit issued by the United States Army corps of
engineers pursuant to section 404 of the federal act. The term includes an individual permit,
activities authorized by a nationwide or regional permit, and a letter of permission issued in
accordance with regulations of the United States Army corps of engineers.
(t) "State waters" has the meaning set forth in section 25-8-103 (19).
(u) "Upland" means any land area that, under normal circumstances, is not a wetland and
does not lie below the ordinary high watermark.
(v) "Wetlands" means areas that are inundated or saturated by surface or groundwater at
a frequency and for a duration sufficient to support, under normal circumstances, a prevalence of
vegetation typically adapted for life in saturated soil conditions.
(4) Duties of the commission. (a) (I) Rules for state dredge and fill discharge
authorization program - definition. The commission shall promulgate rules by December 31,
2025, as necessary to implement a state dredge and fill discharge authorization program. The
rules must focus on avoidance and minimization of adverse impacts and on compensation for
unavoidable adverse impacts of dredge and fill activity and must incorporate the guidelines
developed pursuant to section 404 (b)(1) of the federal act.
(II) The rules promulgated pursuant to subsection (4)(a)(I) of this section must include:
(A) Procedures for the issuance, modification, and termination of individual and general
authorizations, including public notice and participation requirements;
(B) The duration of authorizations; except that the duration of an authorization must not
exceed five years;
(C) The establishment of authorization fees that will be utilized to implement the
program pursuant to section 25-8-210;
(D) Details concerning the division's consultation with federal, state, local, and tribal
entities, especially those entities with special expertise with respect to any environmental-,
natural resource-, or agriculture-related issue; and
(E) An exemption for voluntary stream restoration efforts in ephemeral streams that do
not require compensatory mitigation and are designed solely to provide ecological lift where the
activity is taking place. As used in this subsection (4)(a)(I)(E), "ephemeral stream" means a
stream channel or a reach of a stream channel that carries flow during, and for a short duration as
the direct result of, precipitation events and that has a channel bottom that is always above the
groundwater table.
(III) The rules promulgated pursuant to subsection (4)(a)(I) of this section may include:
(A) Further minor clarification of the terminology used to define the exemptions and
exclusions in subsections (8)(b) and (8)(d) of this section without limiting or expanding the
scope of the exemptions and exclusions; and
(B) A deadline shorter than two years for the division to act upon a complete application
for an individual authorization for projects that involve minimal to moderate costs and have
minimal water quality impacts or limited potential water quality impacts.
(IV) (A) In promulgating the rules described in subsection (4)(a)(I) of this section, the
commission shall ensure that the rules are as protective as the guidelines set forth in section 404
(b)(1) of the federal act and in effect as of May 29, 2024.
(B) If the commission finds, based on a demonstration at a public rulemaking hearing,
that the guidelines set forth in section 404 (b)(1) of the federal act are not protecting state waters,
the commission shall amend its rules or adopt new rules to protect state waters. Such a hearing
may be initiated by the commission upon its own motion or upon a petition from the division.
Any interested person may petition to the commission to initiate a hearing, and the commission
may grant or deny such a request.
(C) The commission's findings to support any changes to its rules must be based on
sound scientific or technical evidence in the record demonstrating that rules more protective than
the guidelines set forth in section 404 (b)(1) of the federal act are necessary to protect the
chemical, physical, and biological integrity of state waters. The findings must be accompanied
by a statement of basis and purpose referring to and evaluating the information and studies
contained in the record, which form the basis for the commission's conclusion.
(b) Rules for individual authorizations. The commission shall promulgate rules by
December 31, 2025, concerning individual authorizations for dredge and fill activities. The rules
must include:
(I) Application requirements, including:
(A) Project location information;
(B) A project description, including site plans;
(C) An alternatives analysis;
(D) A purpose and need statement;
(E) A description of avoidance and minimization measures;
(F) A projected impacts analysis; and
(G) A compensatory mitigation plan;
(II) A prohibition against the discharge of dredged or fill material where there is a
practicable alternative to the proposed discharge that would have less adverse impact on state
waters so long as the alternative does not have other significant adverse environmental
consequences. Any purpose and need statement, evaluation of alternatives, and impacts analysis
developed through the section 404 permitting process shall be used for the purpose of
implementing this prohibition. The rules must also include criteria for the division to use to
implement the prohibition.
(III) Direction to the division to include conditions in individual authorizations, which
conditions are designed to:
(A) Remove or reduce the impact to state waters of a discharge of dredged or fill
material;
(B) Protect downstream uses;
(C) Address the direct, indirect, and cumulative impacts of the activity on the chemical,
physical, and biological integrity of state waters; and
(D) Ensure that an authorized activity as a whole will comply with all applicable state
water quality requirements, either as proposed or as conditioned in the authorization; and
(IV) Other individual authorization terms, such as monitoring, record-keeping, and
reporting requirements.
(c) Rules for compensatory mitigation. The commission shall promulgate rules by
December 31, 2025, to provide details concerning compensatory mitigation requirements,
including methods for assuring impacts to wetlands and streams are fully compensated through
functional assessments and ratios that can be applied through individual mitigation projects or by
applying acre-based ratios using the watershed approach as described by the United States Army
corps of engineers.
(5) Duties of the division. The division has the following duties in administering the
state dredge and fill discharge authorization program:
(a) Individual authorizations. (I) Upon the commission's promulgation of rules
pursuant to subsection (4) of this section, the division shall issue individual authorizations
consistent with the rules promulgated by the commission under subsection (4) of this section.
(II) In addition to any compensatory mitigation requirements the division determines are
necessary to comply with the commission's rules and subsection (5)(c) of this section, for
projects subject to the requirements of section 37-60-122.2 (1)(b), the division shall take into
consideration the official state position regarding mitigation for fish and wildlife resources,
which position is established pursuant to section 37-60-122.2 (1), and may adopt all or part of
such position into individual authorizations as conditions.
(III) The division shall act upon an application for an individual authorization within two
years after receiving a complete application. This period may be extended by a written
agreement between the division and the applicant. This period may also be extended by the
division if there are significant changes to the project that is the subject of the application or if
there is significant new information concerning the environmental impacts of the project, in
which case the division shall provide notice to the applicant of the extension in writing along
with an explanation of the basis for the extension.
(IV) An individual authorization, including all conditions incorporated into the
individual authorization, is subject to administrative reconsideration by the commission under
section 25-8-403 and then judicial review under section 25-8-404.
(b) General authorizations - categories - definitions. (I) In addition to the division's
authority in subsection (5)(b)(III) of this section to issue a statewide general authorization for
discharges to isolated state waters, the division shall issue general authorizations for the
discharge of dredged or fill material into state waters for categories of activities that are similar
in nature and similar in impact on the quality of state waters, cause only minimal adverse
impacts to state waters when performed separately, and have only minimal cumulative adverse
impacts on state waters. The categories of general authorizations must correspond with the
various nationwide and regional permits issued by the United States Army corps of engineers.
The division may tailor the terms of certain nationwide or regional permits or create additional
general authorizations to achieve greater efficiency and to address Colorado-specific needs,
including but not limited to emergency response to wildfire and voluntary ecological restoration
and enhancement projects.
(II) Beginning January 1, 2025, until the rules described in subsection (4) of this section
are promulgated and the division issues general authorizations under the rules, the nationwide
and regional general permits issued by the United States Army corps of engineers, as such
permits apply to Colorado and subject to subsections (8)(b) and (8)(d) of this section, constitute
valid authorizations to discharge dredged or fill material into state waters that are not subject to
federal jurisdiction. The division shall recognize compliance with the applicable terms of the
nationwide and regional general permits as constituting compliance with this section. Beginning
January 1, 2025, an applicant seeking authorization for discharges of dredged or fill material into
state waters that are not subject to federal jurisdiction shall submit to the division any
preconstruction notification required under the applicable nationwide or regional general permit.
If the applicable nationwide or regional general permit requires compensatory mitigation, the
applicant shall obtain a temporary authorization from the division pursuant to subsection
(6)(a)(II) of this section before the commencement of the activity.
(III) (A) As expeditiously as is prudent and feasible, the division shall issue a statewide
general authorization for discharges to isolated state waters. For purposes of this subsection
(5)(b)(III), "isolated state waters" are isolated wetlands, isolated ponds and impoundments, and
isolated ordinary highwater mark reaches.
(B) The division's statewide general authorization for discharges to isolated state waters
does not include the following state waters, which may be isolated state waters: Fens or
peatlands or kettle ponds. Discharges of dredged or fill material to these isolated state waters of
significance require an authorization by the division as described in subsection (5)(a), (5)(b)(I),
or (5)(b)(II) of this section.
(C) The division's statewide general authorization for discharges to isolated state waters
must identify best management practices to protect isolated state waters. The statewide general
authorization for discharges to isolated state waters must not require preconstruction notification
as described in subsection (5)(d) of this section.
(D) The division's statewide general authorization for discharges to isolated waters must
not authorize a project where the entire project's unavoidable adverse impacts exceed one-tenth
of an acre of wetlands or three-hundredths of an acre of streambed. A project in excess of one of
these thresholds requires a permit by the division as described in subsection (5)(a), (5)(b)(I), or
(5)(b)(II) of this section.
(E) If the division issues the statewide authorization for discharges to isolated state
waters described in this subsection (5)(b)(III) prior to the commission's rule-making described in
subsection (4) of this section, the division shall notice the draft general authorization for public
comment for sixty days prior to its issuance. The statewide general authorization for discharges
to isolated state waters is subject to administrative review by the commission pursuant to section
25-8-403.
(F) The authorization term of the statewide general authorization for discharges to
isolated state waters is five years.
(IV) General authorizations issued by the division are subject to administrative
reconsideration by the commission under section 25-8-403; except that notices of authorization
to conduct an activity under a general authorization are not subject to such administrative
reconsideration but are subject to judicial review under section 25-8-404.
(c) Compensatory mitigation requirements. (I) The division shall include
compensatory mitigation requirements in all individual authorizations and in general
authorizations where the division determines that the proposed discharge of dredged or fill
material will result in:
(A) Greater than one-tenth of an acre of unavoidable adverse impacts to wetlands; or
(B) Greater than three-hundredths of an acre of unavoidable impacts to streams.
(II) Compensatory mitigation must compensate for all functions of state waters that will
be lost as a result of the authorized activity. Compensatory mitigation may be accomplished
through the purchase of mitigation bank credits, an in-lieu fee program, or permittee-responsible
mitigation.
(d) Preconstruction notifications. The division shall utilize the existing structure of
preconstruction notifications in the nationwide and regional permits issued by the United States
Army corps of engineers, including general authorizations for categories of activities that do not
require preconstruction notification. Where preconstruction notification is required by a general
authorization before the commencement of an activity, the project proponent must provide at
least thirty calendar days of preconstruction notice to the division unless a shorter notice is
allowed under the terms of the applicable general authorization. After providing such
preconstruction notification, the project proponent may commence the activity if:
(I) The division issues to the project proponent a notice of authorization in writing that
the project proponent may commence the activity; or
(II) Forty-five calendar days elapse without the division providing the project proponent
a notice of written objection to the activity or providing a notice that the division has determined
the notification is incomplete, the activity does not meet the criteria for the category of activities
covered by the general authorization, or the activity will not comply with all applicable federal
and state statutory and regulatory requirements. A notice of written objection provided to a
project proponent by the division must state the basis of the division's objections with
specificity, is subject to direct judicial review under section 25-8-404, and is not subject to
administrative reconsideration under section 25-8-403.
(e) Notices of authorization. The division may issue notices of authorization, where
appropriate, to memorialize coverage under a general authorization. The division may include
conditions in notices of authorization, on a case-by-case basis, to clarify the terms and conditions
of a general authorization or to ensure that the activity will have only minimal individual and
cumulative adverse impacts on state waters.
(f) Administrative guidance. The division may establish guidance to assist in
administering the dredge and fill discharge authorization program. Additionally, the division
may rely upon relevant guidance from the federal environmental protection agency and the
United States Army corps of engineers, including technical guidance and environmental analyses
under the federal "National Environmental Policy Act of 1969", 42 U.S.C. sec. 4231 et seq., as
amended, in administering the program, to the extent such guidance is consistent with this
section and the commission's rules.
(g) Western slope staff. The division may, to the extent resources allow, establish one
or more staff positions in the western slope region of the state to assist with dredge and fill
program administration in that geographic area.
(6) Transition - repeal. (a) Until the rules promulgated by the commission pursuant to
subsection (4) of this section become effective and the division issues general authorizations
under the rules:
(I) Notwithstanding subsection (8)(a) of this section, Clean Water Policy 17 continues in
effect until January 1, 2025;
(II) For activities that do not qualify for enforcement discretion under Clean Water
Policy 17 because the activities would require compensatory mitigation, and for activities that
proceed under a federal nationwide or regional permit pursuant to subsection (5)(b)(II) of this
section and that require compensatory mitigation, the division may issue temporary
authorizations for the discharge of dredged or fill material into state waters:
(A) Where any required compensatory mitigation is associated only with streams and not
wetlands and would result in net increases in the functions and services of state waters; or
(B) Where the applicant shows proof of purchase of mitigation bank credits that meet or
exceed the compensatory mitigation requirements that would have been applicable under the
federal nationwide or regional permit; and
(III) Temporary authorizations must include conditions necessary to protect the public
health and the environment and to meet the intent of this section. The division may issue a
temporary authorization for a period not to exceed two years, and a temporary authorization
expires as provided in the issuance or denial of the final notice of authorization. The final notice
of authorization must include such terms and conditions, including those for compensatory
mitigation, as are necessary to address discharges that occurred under the temporary
authorization.
(b) This subsection (6) is repealed, effective September 1, 2026.
(7) Relationship to section 25-8-104. The rules promulgated pursuant to this section are
subject to, and do not amend or limit, the restrictions described in section 25-8-104.
(8) Applicability and scope of dredge and fill discharge authorization program -
prohibitions on discharge without an authorization - definitions. (a) Except when
conducting an exempted activity described in subsection (8)(b) of this section or when
discharging into an excluded type of water described in subsection (8)(d) of this section, a
person shall not discharge dredged or fill material into state waters without first obtaining
coverage under a general authorization or an individual authorization for the discharge.
(b) The following activities are exempt from the requirements of this section and do not
require a discharge authorization:
(I) Activities in receipt of an active section 404 permit that was issued prior to May 25,
2023;
(II) Activities in receipt of an approved jurisdictional determination issued by the United
States Army corps of engineers prior to May 25, 2023, finding that the state waters into which
the proposed discharge of dredged or fill material will occur are not waters of the United States
unless there has been a significant hydrological change since the determination was issued;
(III) Activities in receipt of an active section 404 permit that was issued on or after May
25, 2023, except to the extent that the project area of the section 404 permit involves a discharge
of dredged or fill material into state waters that have been determined by the United States Army
corps of engineers to not be waters of the United States under the section 404 permit and are not
otherwise excluded under this section;
(IV) Activities associated with a project for which the project proponent applied for an
individual section 404 permit prior to May 25, 2023;
(V) Normal farming, silviculture, and ranching activities, such as plowing; seeding;
cultivating; minor drainage; application of on-farm chemicals; harvesting for the production of
food, fiber, and forest products; or upland soil and water conservation practices. As used in this
subsection (8)(b)(V), "upland soil and water conservation practices" means any discharge of
dredged or fill material into state waters incidental to soil and water conservation practices for
the purpose of improving, maintaining, or restoring uplands, including rangeland management
practices, erosion control practices, and vegetation management practices.
(VI) Maintenance, including emergency reconstruction of recently damaged parts, of
currently serviceable structures, such as dikes, dams, levees, lagoons, groins, riprap,
breakwaters, causeways, bridge abutments or approaches, and transportation structures.
Maintenance also includes minor deviations in a structure's configuration or filled area to
accommodate changes in materials, construction techniques, regulatory requirements, or
construction codes or safety standards.
(VII) Construction or maintenance of farm ponds, stock ponds, farm lagoons, springs,
recharge facilities located in uplands, and irrigation ditches or acequias, or maintenance of a
drainage ditch, roadside ditch, or a ditch or canal conveying wastewater or water. Construction
of new work or to extend, expand, or relocate an irrigation ditch or acequia for municipal or
industrial purposes is not an exempt activity. As used in this subsection (8)(b)(VII):
(A) "Construction" includes new work and work that results in an extension or
expansion of an existing structure, and the construction of irrigation ditches or acequias includes
activities such as placement of new control structures, ditch relocation, ditch conversion into
pipe, and lining, which means placing impervious material such as concrete, clay, or geotextile
within the flow perimeter of an open canal, lateral, or ditch with the intent of reducing seepage
losses and improving conveyance efficiency. All new lining of ditches, in instances where the
ditch has not previously been lined, is considered construction.
(B) "Irrigation ditch or acequia" includes a human-made feature or a maintained natural
feature if use of the maintained natural feature existed on January 1, 2024, and an upland swale
that moves or conveys water to an ultimate irrigation use or place of use, or moves or conveys
irrigation water, also known as "runoff", away from irrigated lands. "Irrigation ditch or acequia"
may include a distribution system or its parts, including human-made canals, laterals, ditches,
siphons, pumps, headgates, wing walls, weirs, diversion structures, pipes, pump systems, return
structures, and such other facilities appurtenant to and functionally related to irrigation ditches.
If a ditch carries water that is used for irrigation, irrigation return flows or return flow
obligations, aquifer recharge, aquifer or stream augmentation or replacement, or precipitation or
snowmelt that moves from an irrigated field either to or away from an area subject to being
irrigated, that ditch is considered an irrigation ditch and not a drainage ditch.
(C) "Maintenance" means maintenance pertaining to a human-made structure, such as a
farm pond, stock pond, or maintained spring, or a maintained natural feature conveying water for
irrigation or wildlife purpose if use of the maintained natural feature existed as of January 1,
2024; maintenance pertaining to a drainage ditch, a roadside ditch, or a ditch or canal conveying
wastewater or water for irrigation or for municipal purposes, domestic purposes, industrial
purposes, commercial purposes, augmentation, recharge, wildlife, recreation, compact
compliance, or any other purpose; and maintenance pertaining to repairs to an existing structure
or feature to keep it in its existing state or proper condition or to preserve it from failure or
decline. Such maintenance includes excavation of accumulated sediments back to original
contours; reshaping of side-slopes; bank stabilization to prevent erosion where reasonably
necessary using best management practices and, for maintenance of drainage ditches, materials
that are compatible with existing bank materials; armoring, lining, and piping for the purpose of
repairing a previously armored, lined, or piped section of a ditch so long as all work occurs
within the footprint of the previous work; and replacement of existing control structures where
the original function is not changed and original approximate capacity is not increased.
(VIII) Construction of temporary sedimentation basins on a construction site, which
construction does not include placement of fill material into state waters;
(IX) Construction or maintenance of farm roads or forest roads or temporary roads for
moving wildfire and post-fire mitigation equipment and related materials or mining equipment
where such roads are constructed and maintained, in accordance with best management
practices, to assure that flow and circulation patterns and chemical and biological characteristics
of the state waters are not impaired, that the reach of the state waters is not reduced, and that any
adverse impacts on the state waters will be otherwise minimized;
(X) Activities for the purpose of providing emergency response to, preventative
mitigation of, or recovery from damage caused by a fire, a flood, or other natural disaster so long
as the activity is conducted in a manner that minimizes the loss of state waters to the extent
practicable and in accordance with best management practices that do not interfere with efforts
to address the underlying emergency;
(XI) Maintenance of water reuse facilities, wastewater reclamation facilities, water
management facilities, water treatment facilities, or wastewater water treatment facilities. Such
maintenance includes reconstruction due to recent damage or maintenance of currently
serviceable structures, such as pumps, control systems, weirs, gates, clarifiers, solids handling,
filters, sedimentation basins, treatment ponds and lagoons, and related features, which
maintenance activities keep the facility in its existing state or proper condition to preserve it
from failure or decline.
(XII) Maintenance activities in off-channel reservoirs that do not directly affect a
connected natural stream. Such maintenance includes emergency reconstruction due to recent
damage; maintenance of currently serviceable structures such as spillways, outlet structures,
gates, pumps, and control systems; and reshaping of side slopes, bank stabilization, or dredging,
which maintenance activities keep an off-channel reservoir in its existing state or proper
condition and to preserve it from failure or decline.
(XIII) Wildlife habitat management activities, including seeding, cultivating, minor
drainage, vegetation management, irrigating, water management, and maintenance of ditches,
dikes, embankments, impoundments, water control features, and other water conveyance
features that are human-made or maintained or that occur naturally to support wildlife habitat.
"Wildlife habitat management" means activities that occur on land managed primarily for
wetland or riparian habitats to support wetland and riparian species and does not include
activities that are incidental to land used for residential, industrial, or commercial purposes.
(c) Recapture provision - rules. Consistent with section 404 (f)(2) of the federal act,
any discharge of dredged or fill material into state waters incidental to any activity that brings an
area of the state waters into a use to which it was not previously subject, where the flow or
circulation of state waters may be impaired or where the reach of such waters may be reduced, is
not included within the exempted activities described in subsection (8)(b) of this section. The
commission may further clarify the effect of this subsection (8)(c) through rule-making.
(d) Excluded types of waters - definitions. Notwithstanding the definition of "state
waters" provided in section 25-8-103 (19), an authorization is not required for the discharge of
dredged or fill material into the following types of waters, and such a discharge is not otherwise
prohibited or regulated under this section:
(I) All portions of ditches and canals that are excavated on upland and that convey water
or wastewater;
(II) Storm water control features that are constructed to convey, treat, or store storm
water and that are created in upland;
(III) Artificially irrigated areas that would revert to uplands if irrigation ceased;
(IV) Artificial lakes, lagoons, or ponds that are created entirely by excavating or diking
upland to collect and retain water and that are used exclusively for stock watering, irrigation,
settling basins, or rice growing;
(V) Wetlands that are adjacent to a ditch or canal and supported by water in the adjacent
ditch or canal;
(VI) Recharge facilities, including ponds, included in uplands for the purpose of
facilitating recharge of aquifers or streams;
(VII) Artificial reflecting or swimming pools or other small ornamental bodies of water
created by excavating or diking upland to retain water for primarily aesthetic reasons;
(VIII) Water-filled depressions created in uplands incidental to mining or construction
activity and pits excavated in uplands for the purpose of obtaining fill, sand, or gravel unless and
until the construction or excavation operation is abandoned and the resulting water feature is
state waters;
(IX) Swales and erosional features, such as gullies, small washes, and rills, that do not
contain wetlands or an ordinary high watermark;
(X) Groundwater. As used in this subsection (8)(d)(X), "groundwater" means subsurface
waters in a zone of saturation that are or can be brought to the surface of the ground or to surface
waters through wells, springs, seeps, or other discharge areas. "Groundwater" does not include
wetlands.
(XI) Prior converted cropland. As used in this subsection (8)(d)(XI), "prior converted
cropland" means any area that, prior to December 23, 1985, was drained or otherwise
manipulated for agricultural purposes, which includes land use that makes the production of an
agricultural product possible, including grazing and haying. Cropland that is left idle or fallow
for conservation or agricultural purposes for any period of time remains in agricultural use and,
if the cropland otherwise qualifies under this subsection (8)(d)(XI), is prior converted cropland.
The commission and the division shall recognize designations of prior converted cropland made
by the United States secretary of agriculture. An area is no longer considered prior converted
cropland if the area is abandoned and has reverted to wetlands. Abandonment occurs when prior
converted cropland is not used for, or in support of, agricultural purposes at least once in the
immediately preceding five years. The division shall determine whether prior converted cropland
has been abandoned, subject to appeal to the commission.
(9) For the 2024-25 state fiscal year and for each state fiscal year thereafter, if the total
number of authorizations issued pursuant to subsection (5) of this section exceeds or is projected
by the department of public health and environment to exceed one hundred ten authorizations,
the department of public health and environment shall seek a supplemental appropriation from
the general assembly to pay the costs of processing the authorizations and to ensure that
authorizations are processed in a timely manner.