Wisconsin Code § 31.12

Map, profile and plans
Open in Lexace · Ask the AI about this section
(1) The grantee of a permit
under s. 31.06, to construct, maintain and operate a dam, before
commencing any work of construction authorized by the permit,
shall submit to the department a complete map and profile on the
scale of not less than one inch per 1,000 feet showing the land
that may be affected by the construction and maintenance of the
dam, or by any flowage that may be caused thereby, and the outline of the flowage, and such other hydrographic and topographic
data as the department may prescribe, and shall also file complete
detailed plans and specifications for the proposed dam, including
all booms, piers, or other protection works.
(2) The department shall examine the map, profile, plans and
specifications; shall hear the grantee thereon and may reject the
same or any part thereof, if unsatisfactory or incomplete, or may
suggest and require modifications thereof. If the map, profile and
plans and specifications are satisfactory and complete, or, if the
same shall be modified as suggested and required, the department
shall so find and approve the same, and thereupon the grantee
may construct the proposed dam in accordance therewith, but the
department may, at any time during the construction of any dam
and in the interest of the public safety, or of any public rights in
navigable waters, authorize, order or require such changes in the
plans and specifications and the construction of the dam as shall
be necessary.
(3) If the department, in the case of an application for a permit to construct a dam with a capacity of less than 250 hydraulic
horsepower at ordinary stage of water, shall find that the information and data furnished in the original or amended application is
sufficient, the applicant shall not be required to furnish the additional or more detailed information or data specified in subs. (1)
and (2). The department may, however, at any time during the
construction of any such dam authorize, order or require changes
in the construction or the method or plan of construction thereof,
as provided in sub. (2).
(4) Within 10 days after the completion of any dam the
grantee shall file with the department a verified statement that
the same was constructed in accordance with the plans and specifications approved by the department; or in case no plans and
specifications were required to be filed, then that the dam was
constructed in accordance with the description contained in the
application.
(5) The department shall establish an expedited procedure for
approval of plans for low hazard dams, as defined in s. 31.19 (1g)
(b), under this section. The expedited procedure shall apply, in
lieu of the procedure under this section, if the department determines that all of the following are satisfied:
(a) The plan design is of a common construction and size or is
for a minor addition to an existing dam.

(b) The plan design is submitted by a registered professional
engineer.
(c) The plan design is submitted by a person who has designed similar dams and none of those similar dams has caused
adverse impacts to the environment.
(d) The plan design contains no unusual siting requirements
or other unique design features.
(e) The plan design is for a dam that is located entirely on land
that the permit grantee owns or that is located entirely on land for
which the permit grantee has acquired an easement.
(f) The plan design is not likely to have an adverse impact on
the environment.