Wisconsin Code § 289.28

Determination of need
Open in Lexace · Ask the AI about this section
(1) DETERMINATION OF
NEED; ISSUES CONSIDERED. A feasibility report shall contain an
evaluation to justify the need for the proposed facility unless the
facility is exempt under sub. (2). The department shall consider
the following issues in evaluating the need for the proposed
facility:
(a) An approximate service area for the proposed facility
which takes into account the economics of waste collection,
transportation and disposal.
(b) The quantity of waste suitable for disposal at the proposed
facility generated within the anticipated service area.
(c) The design capacity of the following facilities located
within the anticipated service area of the proposed facility:
1. Approved facilities, including the potential for expansion
of those facilities on contiguous property already owned or controlled by the applicant.
2. Nonapproved facilities which are environmentally sound.
It is presumed that a nonapproved facility is not environmentally
sound unless evidence to the contrary is produced.
3. Other proposed facilities for which feasibility reports are
submitted and determined to be complete by the department.
4. Facilities for the recycling of solid waste or for the recovery of resources from solid waste which are licensed by the
department.
5. Proposed facilities for the recycling of solid waste or for
the recovery of resources from solid waste which have plans of
operation which are approved by the department.
6. Solid waste incinerators licensed by the department.
7. Proposed solid waste incinerators which have plans of operation which are approved by the department.
(d) If the need for a proposed municipal facility cannot be established under pars. (a) to (c), the extent to which the proposed
facility is needed to replace other facilities of that municipality at
the time those facilities are projected to be closed in the plans of
operation.
(2) DETERMINATION OF NEED; EXEMPT FACILITIES. Subsections (1) and (3) and ss. 289.24 (1) (f) and 289.29 (1) (d) do not
apply to:
(a) Any facility which is part of a prospecting or mining operation with a permit under s. 293.45 or 293.49.
(b) Any solid waste disposal facility designed for the disposal
of waste generated by a pulp or paper mill.
(3) ISSUANCE OF DETERMINATION OF NEED. Except for a facility which is exempt under sub. (2), the department shall issue a
determination of need for the proposed facility at the same time
the final determination of feasibility is issued. If the department
determines that there is insufficient need for the facility, the applicant may not construct or operate the facility.