Washington Code § 77.55.400

Determination as to whether construction is a hydraulic project—Preapplication determination—Review and comment period—Written determination
Open in Lexace · Ask the AI about this section
(1) A person proposing construction or other work landward of the ordinary high water line that will use, divert, obstruct, or change the natural flow or bed of state waters shall submit a permit application to the department. However, if a person is unsure about whether the work requires a permit, they may request a preapplication determination from the department. The department must evaluate the proposed work and determine if the work is a hydraulic project and, if so, whether a permit from the department is required to ensure adequate protection of fish life. (2) The preapplication determination request must be submitted through the department's online permitting system and must contain: (a) A description of the proposed project; (b) A map showing the location of the project site; and (c) Preliminary plans and specifications of the proposed construction or work, if available. (3) The department shall provide tribes and local governments a seven calendar day review and comment period. The department shall consider all applicable written comments received before issuing a determination. (4) The department shall issue a written determination, including the rationale for the decision, within twenty-one calendar days of receiving the request. (5) Determinations made according to the provisions of this section are not subject to the requirements of chapter 43.21C RCW.

‹ Prev All Washington sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.