(1) The point of discharge of water from a POTW may be changed if the director determines that a change is necessary: (a) for treatment purposes; (b) to enhance environmental quality; (c) to protect public health, safety, or welfare; or (d) to comply with: (i) rules created by the Water Quality Board in accordance with Section 19-5-104; or (ii) the POTW's discharge permit. (2) Before changing the point of discharge from a POTW under Subsection (1), the director shall consult with the state engineer.
‹ Prev All Utah sections Next ›
Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.