Utah Code § 73-3b-205

Issuance of recovery permit -- Criteria -- Conditions
Open in Lexace · Ask the AI about this section
The state engineer:
(1) shall issue the recovery permit if the state engineer determines that:
(a) the proposed recovery of artificially recharged water will not impair any existing water right;
(b) the applicant is the holder of an approved recharge permit or recovery permit, or if the
applicant does not hold the recharge permit, has a valid agreement with the owner of the
recharge permit to divert and use the recovered water; and
(c) the recovery point of diversion is located within the area of hydrologic impact of the recharge
project, as determined by the state engineer; and
(2) may attach to the permit any conditions the state engineer determines are appropriate.

‹ Prev All Utah sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.