Utah Code § 17B-2a-208

Bridge or culvert across a public highway, road, or street, or a railroad right-
Open in Lexace · Ask the AI about this section
of-way -- Notice to railway authority -- Option of railway authority to construct bridge or
culvert.
(1)
(a) A drainage district may construct each necessary bridge and culvert across or under a public
highway, road, street, or railroad right-of-way to enable the district to construct and maintain a
canal, drain, or ditch necessary as part of the drainage system of the district.
(b) Before a drainage district constructs a bridge or culvert across or under a railroad right-of-
way, the district shall first give notice to the railway authority empowered to build or construct
bridges and culverts.
(2)

(a) A railway authority may, within 30 days after the notice under Subsection (1)(b) and at its own
expense, build the bridge or culvert according to its own plans.
(b) Each railway authority that builds a bridge or culvert as provided in Subsection (2)(a) shall
construct the bridge or culvert:
(i) so as not to interfere with the free and unobstructed flow of water passing through the canal
or drain; and
(ii) at points that are indicated by a competent drainage engineer.

‹ Prev All Utah sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.