Utah Code § 17-78-303

Distribution of waters -- Operation of projects
Open in Lexace · Ask the AI about this section
The duty of distributing the waters of and operating the flood control project when completed
shall rest upon the state engineer described in Section 73-2-1, provided, that the cost of such
distribution and operation of the project by the state engineer shall be borne by the county entering
into the cooperative contract with the United States of America for the construction and the
operation of the flood control project.
Renumbered and Amended by Chapter 14, 2025 Special Session 1

‹ Prev All Utah sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.