Utah Code § 11-42-108

Utility connections before paving or repaving is done -- Failure to make
Open in Lexace · Ask the AI about this section
connection.
(1) The governing body may require:
(a) that before paving or repaving is done within an assessment area, all water, gas, sewer, and
underground electric and telecommunications connections be made under the regulations
and at the distances from the street mains to the line of the property abutting on the street to
be paved or repaved that the local entity prescribes by resolution or ordinance; and
(b) the water company owning the water pipe main, the gas company owning the gas pipe
main, and the electric or telecommunications company owning the underground electric or
telecommunications facilities to make the connections.
(2) Upon the failure of a water company, gas company, or electric or telecommunications company
to make a required connection:
(a) the local entity may cause the connection to be made; and
(b)
(i) the cost that the local entity incurs in making the connection shall be deducted from the
amount of any debt the local entity owes to the company; and
(ii) the local entity may not pay a bill from the company until all the cost has been offset as
provided in Subsection (2)(b)(i).

‹ Prev All Utah sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.