Sec. 361.108. ENGINEERING REPORT FOR HAZARDOUS WASTE LANDFILL. The commission by rule shall require an applicant for a new hazardous waste landfill filed after January 1, 1986, to provide an engineering report evaluating: (1) the benefits, if any, associated with constructing the landfill above existing grade at the proposed site; (2) the costs associated with the above grade construction; and (3) the potential adverse effects, if any, that would be associated with the above grade construction.
‹ Prev All Texas sections Next ›
Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.