Sec. 134.122. AMOUNT OF BOND. (a) The commission shall determine the amount of the bond required for each bonded area. (b) The amount of the bond shall: (1) reflect the probable difficulty of the reclamation, considering factors including: (A) topography; (B) geology of the site; (C) hydrology; and (D) revegetation potential; and (2) be sufficient to assure completion of the reclamation plan if the commission has to perform the work in the event of forfeiture. (c) The bond for the entire area under one permit may not be less than $10,000.
‹ Prev All Texas sections Next ›
Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.