With reference to property without corporate limits, the statement required by § 10-35-3 shall give the following information: (1) The number of miles of pole lines, gas or water mains in each county in the state in alphabetical order; (2) The number of poles per mile and length and size of the same, and the length and size of gas or water pipes; (3) The number of miles of wire and a detailed description of the same; (4) The cost of construction of such lines fully equipped, together with the present or depreciated value per mile of such lines in each county.