Oregon Code § ORS 536.750

Powers of commission after declaration of drought; rules
Open in Lexace · Ask the AI about this section
(1) Notwithstanding any provision of ORS chapters 536 to 543A, after a declaration that a severe, continuing drought exists, the Water Resources Commission may:
(a) Issue without first conducting a hearing under ORS 536.077 and 537.170 a temporary permit for an emergency use of water;
(b) Allow a temporary change in use, place of use or point of diversion of water without complying with the notice and waiting requirements under ORS 540.520;
(c) Notwithstanding the priority of water rights, grant preference of use to rights for human consumption or stock watering use;
(d) Waive the notice requirements under ORS 537.753 and the start card required under ORS 537.762;
(e) Allow a temporary exchange of water without giving notice as required under ORS 540.535; and
(f) Utilize an expedited notice and waiting requirement established by rule for the substitution of a supplemental ground water right for a primary water right under drought conditions.
(2) The commission by rule may establish procedures for carrying out the provisions of this section and a schedule of fees that must accompany a request under subsection (1) of this section.

‹ Prev All Oregon sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.