Oklahoma Code § 52-8

Title 52. Oil And Gas: Plat and information showing trunk lines - Filing with
Open in Lexace · Ask the AI about this section
Corporation Commission.
Before any gas pipeline corporation shall acquire any right-of-
way, or exercise the right of eminent domain within this state, or
construct any pipelines for the transportation of gas, it shall file
in the office of the Corporation Commission a plat showing in detail
the points in this state between which and the route along which its
trunk line is proposed to be constructed, the intended size and
capacity thereof, and the location and capacity of all pumping
stations, gate valves, check valves and connections of all kinds on
said trunk lines; and upon the demand of the Corporation Commission,
it shall file a plat showing in detail all the lines owned or
operated by it, with full information as to their capacity and size,
location and capacity of its pumping station, gate valves, check
valves and connections of all kinds in existence.

‹ Prev All Oklahoma sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.