North Dakota Code § 49-22-05.1

d. A description of mitigative measures that will be taken to minimize all foreseen
Open in Lexace · Ask the AI about this section
adverse impacts resulting from the location, construction, and operation of the 
proposed facility.
e. A description of the right -of-way preparation and construction and reclamation 
procedures.
f. A statement setting forth the manner in which:
(1) The utility will inform affected landowners of easement acquisition, and 
necessary easement conditions and restrictions.

(2) The utility will compensate landowners for easements, without reference to 
the actual consideration to be paid.
g. Such other information as the utility may consider relevant or the commission 
may require.
2. After determining that the application is complete, the commission shall serve a notice 
of filing of the application on such persons and agencies that the commission may 
deem appropriate and shall publish a notice of filing of the application in the official 
newspaper of each county in which any portion of the designated corridor is located.
3. A copy of the application shall be furnished to any person or agency, upon request to 
the commission within thirty days of either service or publication of the notice of filing.
4. An application for an amendment of a permit shall be in such form and contain such 
information as the commission shall prescribe.
5. The commission shall designate a route for the construction of an electric transmission 
facility following the study and hearings provided for in this chapter. This designation 
shall be made in accordance with the evidence presented at the hearings, an 
evaluation of the information provided in the application, the criteria established 
pursuant to section 49-22-05.1, and the considerations set out in section 49 -22-09 in a 
finding with reasons for the designation, and shall be made in a timely manner no later 
than six months after the filing of a completed application. The time for designation of a 
route may be extended by the commission for just cause. The failure of the 
commission to act within the time limit provided in this section shall not operate to 
divest the commission of jurisdiction in any permit proceeding. Upon designation of a 
route the commission shall issue a permit to the applicant with such terms, conditions, 
or modifications deemed necessary.