water underground gathering pipelines. The application of this section is limited to an underground gathering pipeline that is designed or intended to transfer crude oil or produced water from a production facility for disposal, storage, or sale purposes and which was placed into service after August 1, 2015. Upon request, the operator shall provide the commission the underground gathering pipeline engineering construction design drawings and specifications, list of independent inspectors, and a plan for leak protection and monitoring for the underground gathering pipeline. Within sixty days of an underground gathering pipeline being placed into service, the operator of that pipeline shall file with the commission an independent inspector's certificate of hydrostatic or pneumatic testing of the underground gathering pipeline.
‹ Prev All North Dakota sections Next ›
Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.