48:25-17 Preference, High-Powered DC Fast Charger or DC Fast Charger demonstration projects applications, charging infrastructure, medium-, heavy-duty vehicles, fleets. 5. The board shall give preference to any application made pursuant to section 4 of P.L.2023, c.316 (C.48:25-16) for any High-Powered DC Fast Charger or DC Fast Charger demonstration project that results in charging infrastructure for medium- and heavy-duty vehicles or fleets and that: a. is located within a brownfield; b. is publicly accessible or designed to electrify fleets owned by public entities; c. electrifies private fleets located in, primarily operating in, or benefiting overburdened municipalities; d. provides job creation and job training for disadvantaged persons, as determined by the board, in consultation with the authority; e. is cost effective to ratepayers, considering vehicle miles electrified and incentive requested; f. is likely to lead to scalable implementation of medium- and heavy-duty vehicle charging infrastructure; g. has a positive impact on electrified and non-electrified vehicle traffic inside of overburdened municipalities; h. effectively incorporates a managed charging program at peak periods or minimizes demand charge peaks; i. minimizes the use of fossil fuel infrastructure; j. is likely to result in the reduction of emissions; or k. results in an expansion of the State's manufacturing base for an emerging clean transportation economy and demonstrates a collaboration with a State-certified educational training entity. L.2023, c.316, s.5.
‹ Prev All New Jersey sections Next ›
Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.