New Hampshire Code § 371:1

Petition
Open in Lexace · Ask the AI about this section
Whenever it is necessary, in order to meet the reasonable requirements of service to the public, that any public utility should construct a line, branch line, extension, pipeline, conduit, line of poles, towers, or wires across the land of another, or should acquire land, land for an electric substation, or flowage, drainage, or other rights for the necessary construction, extension, or improvement of any water power or other works owned or operated by such public utility, and it cannot agree with the owners of such land or rights as to the necessity or the price to be paid therefor, such public utility may petition the public utilities commission for such rights and easements or for permission to take such lands or rights as may be needed for said purposes. No public utility may petition for permission to take private land or property rights for the construction or operation of an electric generating plant or an electric transmission project not eligible for regional cost allocation, for either local or regional transmission tariffs, by ISO-New England or its successor regional system operator.

‹ Prev All New Hampshire sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.