Nevada Code § 704.7338

Electric utility to file list of assets with Commission; contents of list
Open in Lexace · Ask the AI about this section
1. Each electric utility that is required
to file a plan pursuant to NRS 704.741 shall include as part of that plan a list of all assets of the electric
utility.
2. Each electric utility not specified in
subsection 1 which holds a permit issued pursuant to NRS 704.870 shall, on or before January 31
of each year, file with the Commission a list of all assets.
3. Each electric utility not specified in
subsection 1 or 2 which owns a utility facility, as defined in NRS 704.860 , that was permitted by a local
authority based on an application filed before July 1, 1971, shall file with
the Commission a list of all assets of the electric utility.
4. The list of assets required by
subsections 1, 2 and 3 must:
(a) Include a brief description of each asset;
(b) Include the output capacity of each asset;
(c) Classify each asset as operational,
pre-operational reserve, post-operational reserve, surplus or decommissioned;
and
(d) For each asset classified as pre-operational
reserve or post-operational reserve, include a statement in a form approved by
the Commission regarding the viability of the future use of the asset for
energy generation.
5. Any asset with more than one owner must
be included on the list of assets of each owner who is required to file a list
pursuant to this section.