Nevada Code § 533.240

All claimants to be made parties in any suit brought to determine rights; State Engineer to prepare hydrographic survey of stream system; costs; transfer of suit to State Engineer for determination
Open in Lexace · Ask the AI about this section
1. In any suit brought in the district
court for the determination of a right or rights to the use of water of any
stream, all persons who claim the right to use the waters of such stream and
the stream system of which it is a part shall be made parties.
2. When the suit has been filed, the court
shall direct the State Engineer to furnish a complete hydrographic survey of
the stream system as provided in NRS 533.100 in order to obtain all physical data necessary to the determination of the
rights involved.
3. The cost of the suit, including the
costs on behalf of the State and of the surveys, shall be charged against each
of the private parties thereto based on a determination by the court of the
relative merits of the claims made by each of the private parties. The court
may assess and charge against any party at any time during the suit an
equitable amount to pay the costs of the survey upon its approval of an
itemized statement therefor submitted by the State Engineer.
4. The court may at any time transfer the
suit to the State Engineer for determination as provided in this chapter.

‹ Prev All Nevada sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.