Nevada Code § 533.145

Objections to preliminary order of determination; form and contents of objection
Open in Lexace · Ask the AI about this section
1. Any person claiming any interest in the
stream system involved in the determination of relative rights to the use of
water, whether claiming under vested right or under permit from the State
Engineer, may object to any finding, part or portion of the preliminary order
of determination made by the State Engineer by filing objections with the State
Engineer within 30 days after the evidence and proofs, as provided in NRS 533.140 , shall have been opened to
public inspection, or within such further time as for good cause shown may be
allowed by the State Engineer upon application.
2. Such objections shall be verified by
the affidavit of the objector, or the objectors agent or attorney, and shall
state with reasonable certainty the grounds of objection.

‹ Prev All Nevada sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.