Nevada Code § 338.1697

Authorized provision in contract with construction manager at risk for construction of public work or portion thereof for guaranteed maximum price
Open in Lexace · Ask the AI about this section
A contract entered into
pursuant to NRS 338.1696 that is for a
guaranteed maximum price may include a provision that authorizes the
construction manager at risk to receive all or part of any difference between
the guaranteed maximum price set forth in the contract and the actual price of
construction of the public work, if the actual price is less than the
guaranteed maximum price.