Utility project means: 1. An electric transmission line which is designed to operate at 200 kilovolts or more; or 2. A line used to transport natural gas which operates at 20 percent or more of the specified minimum yield strength of the material from which the line is constructed, which has been approved for construction after October 1, 1991, by the State or Federal Government or a governing body.
‹ Prev All Nevada sections Next ›
Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.