Nebraska Code § 76-3505

New construction not required to use radon resistant new construction; when.
Open in Lexace · Ask the AI about this section
New construction after September 1, 2019, shall not be required to use radon resistant new construction if (1) the construction project utilizes the design of an architect or professional engineer licensed under the Engineers and Architects Regulation Act, (2) the construction project is located in a county in which the average radon concentration is less than two and seven-tenths picocuries per liter of air as determined by the department pursuant to section 76-3507, or (3) other than for any residential dwelling unit, a local building official makes a determination, after a review of relevant guidelines for the intended use of the structure and property conditions, that radon resistant new construction is not necessary.

‹ Prev All Nebraska sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.