In the event the substructure of such bridges or approaches is built wholly or in part of stone, brick, cement or concrete, the contract for the portion of the substructure to be built of such material shall be let at a specified sum per cubic foot in place.
‹ Prev All Nebraska sections Next ›
Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.