Montana Code § 69-3-714

Criteria For Allowable Advanced Conductor Programs
Open in Lexace · Ask the AI about this section
69-3-714 . Criteria for allowable advanced conductor programs. (1) The commission may approve cost-effectiveness criteria for advanced conductor projects that may be placed into a utility's rate base under this part. (2) Criteria must be based on established direct current resistance at standard pressure and a temperature of 20 degrees Celsius. (3) As used in this section, "advanced conductor" means an overhead electricity conductor installed in a transmission or distribution project that has a direct current electrical resistance at least 10% lower than existing conductors of a similar diameter on the system. (4) In establishing cost-effectiveness criteria, the commission may consider decreased electrical losses and any other relevant consumer, environmental, and system benefits provided by advanced conductors.

‹ Prev All Montana sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.