The division of facilities management, design and construction shall promulgate a method to accurately calculate the replacement cost of all buildings owned by public institutions of higher education. The method shall be developed in cooperation with such institutions and shall include the necessary components and factors to accurately calculate a replacement cost. The division shall utilize a procedure to allow differences to be resolved and may include an alternative calculation where the original cost plus an inflation factor is utilized to determine a replacement cost value.
‹ Prev All Missouri sections Next ›
Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.