Michigan Code § 408.1103

Prevailing Wage and Fringe Benefit Rates; Schedule as Part of Specifications and Bid Form.
Open in Lexace · Ask the AI about this section
Sec. 3.
A contracting agent, before advertising for bids on a state project, shall have the commissioner determine the prevailing rates of wages and fringe benefits for all classes of construction mechanics called for in the contract. A schedule of these rates shall be made a part of the specifications for the work to be performed and shall be printed on the bidding forms where the work is to be done by contract. If a contract is not awarded or construction undertaken within 90 days of the date of the commissioner's determination of prevailing rates of wages and fringe benefits, the commissioner shall make a redetermination before the contract is awarded.
History: 2023, Act 10, Eff. Feb. 13, 2024

‹ Prev All Michigan sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.