Michigan Code § 324.5410

Water Suppliers; Responsibility to Obtain Permits or Clearances; Incorporation of Provisions, Conditions, and Mitigative Measures; Review of Documents by Department; Enforcement.
Open in Lexace · Ask the AI about this section
Sec. 5410.
(1) A water supplier who receives assistance under this part is responsible for obtaining any federal, state, or local permits or clearances required for the project and shall perform any surveys or studies that are required in conjunction with the permits or clearances.
(2) A water supplier who receives assistance under this part shall incorporate all appropriate provisions, conditions, and mitigative measures included in the applicable studies, surveys, permits, clearances, and licenses into the construction documents. These documents are subject to review by the department for conformity with environmental determinations and coordination requirements.
(3) All applicable and appropriate conditions and mitigative measures shall be enforced by the water supplier or its designated representative and shall apply to all construction and post-construction activities, including disposal of all liquid or solid spoils, waste material, and residuals from construction.
History: Add. 1997, Act 26, Imd. Eff. June 17, 1997 Popular Name: Act 451 Popular Name: NREPA