Massachusetts Code § 146-6

Annual inspection; extension of time; first inspection
Open in Lexace · Ask the AI about this section
Section 6. All steam boilers and their appurtenances except those specified in the following section shall be thoroughly inspected externally and internally at least once a year. Upon written application made to it by the owner or user of a pressure vessel or boiler, the board may, when the public interest and convenience require, extend the time for the making of such inspection for a period not to exceed six months as the board may determine. A district engineering inspector of the division of inspection of the department of fire services shall perform the first inspection of a pressure vessel required by this chapter.