Massachusetts Code § 146-23

Certificate of inspection; prerequisites; necessity
Open in Lexace · Ask the AI about this section
Section 23. If upon inspection the district engineering inspector finds the boiler to be in safe working order with the fittings necessary to safely and properly set up the boiler and its appurtenances conform to the rules of the board, the department shall issue to the owner or user thereof a certificate of inspection stating the maximum pressure at which the boiler may be operated, as ascertained by the rules of the board, and thereupon such owner or user may operate the boiler mentioned in the certificate. If the district engineering inspector finds otherwise, the department shall withhold the certificate until the boiler and its fittings are put in a condition to ensure safety of operation and to ensure that the boiler and its appurtenances conform to the rules of the board and the owner or user shall not operate such boiler, or cause it to be operated, until such certificate has been granted.

‹ Prev All Massachusetts sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.