Maryland Code § EN-5-401

Section EN-5-401
Open in Lexace · Ask the AI about this section
(a) In this subtitle the following words have the meanings indicated.
(b) "Authority" means Maryland Potomac Water Authority.
(c) "Federal government" means:
(1) The United States of America; or
(2) Any governmental agency of the United States of America.
(d) "Initial cost" means the portion of water supply costs of the project which
nonfederal entities must contract to repay prior to construction of the project. Actual
payment of initial cost may be extended over a 50-year period beginning when
augmented flow first is available from the project.
(e) "Non-Maryland user" means a user not assessable by a represented
county.
(f) "Potomac River" means the main stem and North Branch of the Potomac
River and its tributaries in those reaches below the augmented average flow surface
level of the main stem and North Branch.
(g) "Project" means a federally constructed dam, reservoir, and
appurtenances on the North Branch of the Potomac River, commonly referred to as
the Bloomington Dam project.
(h) "Represented county" means any county enumerated in this subtitle as
being within the district.
(i) "The district", unless otherwise indicated in the text to mean the District
of Columbia, means the area of jurisdiction of the Authority, which includes the
following counties: Allegany, Frederick, Garrett, Montgomery, Prince George's, and
Washington.
(j) "User" means any person who uses water from the Potomac River for
any purpose without regard to whether or not the water is consumed, altered, or
replaced.

‹ Prev All Maryland sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.