Maryland Code § EN-15-815

Section EN-15-815
Open in Lexace · Ask the AI about this section
(a) (1) Any permittee engaged in surface mining under a surface mining
permit may apply at any time for modification of the permit.
(2) The application shall be in writing on forms furnished by the
Department and fully state the information called for.
(3) The applicant may be required to furnish additional information
that the Department reasonably deems necessary to enforce this subtitle.
(4) If an applicant states in writing that information has not changed
since the original application, the applicant is not required to resubmit that
information.
(b) (1) A modification under this section may affect:
(i) The land area covered by the permit;
(ii) The approved mining and reclamation plan coupled with
the permit; or
(iii) Other terms and conditions of the permit.
(2) (i) A permit may be modified to include land contiguous to the
existing affected land, but not other lands.
(ii) The mining and reclamation plan may be modified in any
manner, if the Department determines that the modified plan fully meets the
standards set forth in § 15-822 of this subtitle and that the modifications would be
generally consistent with the bases for the issuance of the original permit.
(iii) Other terms and conditions may be modified only if the
Department determines that the permit as modified would meet the requirements of
§§ 15-808 and 15-810 of this subtitle.
(iv) A modification may not extend the expiration date of any
permit issued under this subtitle.

(c) Except as otherwise provided in subsection (d) of this section, a $150 fee
shall be charged for a permit modification.
(d) (1) In addition to the fee required in subsection (c) of this section, a
fee shall be charged equal to:
(i) $18.50 for each additional acre of affected land over and
above the amount of land covered in the original permit for each year of operation,
not to exceed $3,000; and
(ii) Except as provided in paragraph (2) of this subsection, 0.50
cent per ton of mined material sold per year.
(2) The per ton of material sold fee in paragraph (1) of this subsection
shall be increased by 0.13 cent per ton in fiscal year 2028 and every 2 fiscal years
thereafter.
(e) The Department shall approve and grant the permit modification
requested as expeditiously as possible but not later than 30 days after the application
forms or any supplemental information required are filed with the Department.
(f) The Department may deny the permit modification on finding:
(1) An uncorrected violation of the type listed in § 15-810(b)(7) of this
subtitle;
(2) Failure to submit an adequate mining and reclamation plan in
light of conditions existing at the time of the modification; or
(3) Failure or refusal to pay the modification fee.
(g) If the Department denies an application to modify a permit, the
Department shall give the permittee written notice of:
(1) The Department's determination;
(2) Any changes in the application which would make it acceptable;
and
(3) The permittee's right to a hearing at a stated time and place.
(h) The date for the hearing may not be less than 15 days nor more than 30
days after the date of the notice unless the Department and the permittee mutually
agree on another date.