(a) (1) (i) After completion of all coal removal, backfilling, regrading,
and planting on the permit, the operator shall file with the Department a completion
report on a form furnished by the Department no later than the time the next mining
and reclamation progress report required by § 15-508(b) of this subtitle is to be
submitted.
(ii) The report shall identify the operation, the area of land
affected by the strip mining operation, and identify any area proposed to be reserved
for deep mining or any other lawful purpose in accordance with subsection (b) of this
section.
(2) The completion report shall be accompanied by a completion map.
The map shall be prepared and certified by a registered professional engineer or
registered land surveyor and contain the following information:
(i) The information required by the map under § 15-505(c)(2)
of this subtitle;

(ii) The surveyed boundaries of the areas affected on the
permit;
(iii) The surveyed boundaries of all areas which have been
backfilled and planted on the permit and indicate the month and year each area was
planted;
(iv) The surveyed boundaries of any areas proposed to be
reserved for deep mining or other purposes under subsection (b) of this section; and
(v) A legend which indicates the total acres of the permit, acres
affected on the permit, the acres remaining open on the permit, and the acres
reserved for deep mining or other purposes.
(3) (i) The Department shall review the completion report.
(ii) If the Department determines the report is correct, the
report shall be approved.
(iii) If the report is not approved, the Department shall notify
the operator, in writing, setting forth the reasons for disapproval and identify the
action necessary to secure approval.
(iv) The operator shall take the action necessary to secure
approval of the report.
(v) Approval of the completion report by the Department
exempts the operator from the filing of further mining and reclamation progress
reports on the permit pursuant to § 15-508(b) of this subtitle.
(b) If the operator or any other person desires to conduct deep mining on
the premises or use a portion of the permit area for haulageways or any other lawful
purpose, the operator may designate a location, subject to the Department's approval,
to be used for one or more of these purposes. At a designated and approved location
it is not necessary to backfill as required by this subtitle until the deep mining or
other use is completed. During this time the bond on file for that portion of the
operation may not be released unless a bond as required by Subtitle 6 of this title is
filed with the Department. The area of each reserved opening and its location shall
be described in the completion report and designated on the attached map. Before
commencing operation of a deep mine, a permit must be obtained and a bond filed as
required by Subtitle 6 of this title.

(c) If within two years after the completion of the strip mining operation
deep mining has not been initiated at the proposed location, reclamation shall be
completed in accordance with this subtitle.