Maryland Code § ED-5-320

Section ED-5-320
Open in Lexace · Ask the AI about this section
(a) (1) For the purposes of this section, replacement cost shall be
determined by the product of the area of a building that is over 40 years old times the
current cost per square foot of building construction which may not include:

(i) Specialized costs of demolition;
(ii) Site development;
(iii) The fees of architects and engineers; or
(iv) Air conditioning.
(2) All existing area that is not at least 40 years old shall be excluded
from this calculation.
(b) If a county board finds, after preparing feasibility and life cycle cost
studies, that it is appropriate and economically beneficial to renovate an existing
school building that, in whole or part, has been in continuous educational use for 40
years or more and the cost of the proposed renovation work is not more than the
replacement cost of the building or part of a building of the same area and purpose,
the Interagency Commission shall consider a request for State funding on the basis
of these findings.
(c) Before it is considered for funding, the project shall be:
(1) Justified as to need and continued purpose; and
(2) Included in an annual capital improvement program that has
been approved by the Interagency Commission.