Maine Code § 38-1319-S

Hazardous waste facility closure
Open in Lexace · Ask the AI about this section
(REALLOCATED FROM TITLE 38, SECTION 1308-A)
1. Closure plan. Closure of any new or existing waste facility for hazardous waste and, if required,
post-closure care, must be in accordance with a closure plan and, if required, a post-closure plan,
approved by the board. An applicant for a license for a waste facility for hazardous waste shall submit
a closure plan and, if required, post-closure plan, for approval with any application for a license. For a
facility that is licensed at the time of closure under an interim license, the licensee shall submit a closure
plan and, if required, post-closure plan, for approval at least 180 days before the date on which the
licensee begins closure. The closure plan and, if required, post-closure plan must include measures,
such as leachate control, site stabilization and monitoring, to evaluate and maintain the integrity of the
facility site in order to prevent harm to the public health, safety and welfare and to the environment.
[PL 1989, c. 890, Pt. A, §40 (AFF); PL 1989, c. 890, Pt. B, §264 (AMD).]
2. Closure notice. Upon approval of a closure plan for a facility for hazardous waste, the
commissioner shall file notice with the register of deeds for the county in which the facility is located.
This notice must contain the name and address of the current owner of the property, its location, the
nature of hazardous wastes handled and the methods of treatment, storage and disposal used at the
facility.
[PL 1989, c. 890, Pt. A, §40 (AFF); PL 1989, c. 890, Pt. B, §264 (AMD).]
3. Restrictions. The board may require the present or subsequent owner of the land used for a
facility for hazardous waste to execute and record a written instrument which imposes a restrictive
covenant on the present and future uses of all or part of the land. The covenant shall be recorded in the
registry of deeds of the county in which the facility is located. The instrument shall be executed by the

owners of the property and the commissioner. It may only be required when the board determines that
it is necessary to protect the public health and safety. A covenant executed under this section shall run
with the land.
[PL 1987, c. 517, §21 (RAL).]
4. Petition for removal of restrictions. The owner of the property restricted by covenant under
subsection 3 may petition the board to modify or remove these deed restrictions. This petition shall
detail the restrictions to which the petitioner objects, the basis of the objections, the nature of the relief
requested and the nature of any new or additional evidence to be offered. Upon a showing that the
restrictions are not necessary to protect public health and safety, the board may remove all or part of
the restrictions.
[PL 1987, c. 517, §21 (RAL).]
5. Post-closure orders. Without restricting or limiting any other remedy, the department may
issue a post-closure order and enforce its terms when the facility owner or operator has failed to submit
a complete application for a post-closure license under section 1319-R, subsection 6, in a timely
manner.
[PL 1989, c. 794, §7 (NEW).]

‹ Prev All Maine sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.