Maine Code § 23-3351-A

Moratorium restoration requirement
Open in Lexace · Ask the AI about this section
If a municipality issues a permit to open a street within 5 years after that street or highway was
paved or substantially repaired, the municipality may require the permittee to relay the full width of the
road surface on both sides of the cut for a distance of 20 feet from the furthest outside edges of the cut.
If that repair overlaps the edge of a repair from a previous opening, the municipality may require the
permittee to relay the full width of the road to the furthest edge of that previous repair. The municipality
may prescribe the depth and method of restoring the pavement based upon the class of the street, except
that in no case may the depth of the restored pavement be less than 1 1/2 inches. [PL 1999, c. 337,
§3 (NEW).]

‹ Prev All Maine sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.