Where a highway is built across a drainage or irrigation canal which was dug by a floating dredge or which may be subject to cleaning or recleaning by a floating dredge, a bridge shall be built at the crossing of a design approved by the chief engineer which shall permit a quick, easy, and efficient removal and replacing to facilitate the cleaning of the canal.
‹ Prev All Louisiana sections Next ›
Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.