Kentucky Code § KRS 353.140

Gas escape pipe, when to be used
Open in Lexace · Ask the AI about this section
When a well has been filled and securely plugged to a point forty (40) feet below the lowest workable coal bed, and in the judgment of the well operator, the coal operator and the department a permanent outlet to the surface is required, the outlet shall b e provided in the following manner: A plug of cement or other suitable material shall be placed in the well at a suitable point, not less than ten (10) feet below the lowest workable coal bed. In this plug and passing through the center of it shall be secu rely fastened an open pipe, not less than two (2) inches in diameter, which shall extend to the surface. At or above the surface the pipe shall be provided with a device that will permit the free passage of gas and prevent obstruction. After the plug and p ipe are set, the hole shall be filled with cement to a point ten (10) feet above the lowest workable coal bed. If there are additional overlying workable coal beds, they shall be treated similarly, if in the judgment of the well operator, the coal operator and the department such treatment is necessary. If the parties cannot agree, the decision of the department shall control.

‹ Prev All Kentucky sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.