Iowa Code § 468.109

Construction across railroad
Open in Lexace · Ask the AI about this section
Whenever the board of supervisors shall have established any levee, or drainage district, or change of any natural watercourse and the levee, ditch, drain, or watercourse as surveyed and located crosses the right-of-way of any railroad company, the county auditor shall immediately cause to be served upon such railroad company, in the manner provided for the service of original notices, a notice in writing stating the nature of the improvement to be constructed, the place where it will cross the right-of-way of such company, and the fullrequirements for its complete construction across such right-of-way as shown by the plans, specifications, plat, and profile of the engineer appointed by the board, and directing such company to construct such improvement according to said plans and specifications at the place designated, across itsright-of-way, and to build and construct or rebuild and reconstruct the necessary culvert or bridge where any ditch, drain, or watercourse crosses itsright-of-way, so as not to obstruct, impede, or interfere with the free flow of the water therein, within thirty days from the time of the service of such notice upon it. [S13, §1989-a18; C24, 27, 31, 35, 39, §7540; C46, 50, 54, 58, 62, 66, 71, 73, 75, 77, 79, 81, §455.119] CS89, §468.109 Manner ofservice,R.C.P.1.302–1.315

‹ Prev All Iowa sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.