A city may require a railway company to provide necessary structures, temporary and permanent, to carry itstracks during and after construction of a diverted channel for flood control purposes, subject to the following: 1. The city shall give notice to the railway company, served in the same manner as an original notice, stating: a. The nature of the flood control project. b. The place where the diverted channel will cross the company’s right-of-way. c. The specifications for construction of the diverted channel across the company’s right-of-way. d. Details of the city’s requirement for the company to provide the necessary structures where the diverted channel crosses the right-of-way, including a designated period of time for construction, and a requirement that the construction be in a manner which does not interfere with the construction of the diverted channel or the free flow of water. 2. If the company does not comply with the requirement, the city may provide the necessary structures, and the railway isliable for the cost of the construction, in addition to itsliabilityfor assessment for special benefits as other property is assessed. The cost of the construction may be collected by the city from the company by court action.
‹ Prev All Iowa sections Next ›
Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.