Indiana Code § 9-18.1-5-12

Supplemental fee; electric vehicles; hybrid vehicles
Open in Lexace · Ask the AI about this section
Note: This version of section effective until 1-1-2026. See also following version of this section, effective 1-1-2026.       Sec. 12. (a) The supplemental fee in this section applies after December 31, 2017, to each electric vehicle and hybrid vehicle that is required to be registered under this article. The supplemental fee in this section does not apply to vehicles subject to the motor carrier fuel tax under IC 6-6-4.1 .       (b) As used in this section, "electric vehicle" means a vehicle that: (1) is propelled by an electric motor powered by a battery or other electrical device incorporated into the vehicle; and (2) is not propelled by an engine powered by the combustion of a hydrocarbon fuel, including gasoline, diesel, propane, or liquid natural gas.       (c) As used in this section, "hybrid vehicle" means a vehicle that: (1) draws propulsion energy from both an internal combustion engine and an energy storage device; and (2) employs a regenerative braking system to recover waste energy to charge the energy storage device that is providing propulsion energy.       (d) In addition to any other fee required to register an electric vehicle under this chapter, the supplemental fee to register an electric vehicle is one hundred fifty dollars ($150). The bureau shall determine a new fee amount to take effect as of January 1 of the following year by determining the product of the following: (1) Before October 1, 2023: (A) the fee in effect for the determination year; multiplied by (B) the factor determined under IC 6-6-1.6-2 (b). (2) Before October 1 of each year thereafter: (A) the fee in effect for the determination year; multiplied by (B) the factor determined under IC 6-6-1.6-3 . The fee shall be rounded to the nearest dollar.       (e) In addition to any other fee required to register a hybrid vehicle under this chapter, the supplemental fee to register a hybrid vehicle is fifty dollars ($50). The bureau shall determine a new fee amount to take effect as of January 1 of the following year by determining the product of the following: (1) Before October 1, 2023: (A) the fee in effect for the determination year; multiplied by (B) the factor determined under IC 6-6-1.6-2 (b). (2) Before October 1 of each year thereafter: (A) the fee in effect for the determination year; multiplied by (B) the factor determined under IC 6-6-1.6-3 . The fee shall be rounded to the nearest dollar.       (f) The fee shall be deposited in the local road and bridge matching grant fund established by IC 8-23-30-2 .   IC 9-18.1-5-12 Supplemental fee; electric vehicles; hybrid vehicles       Note: This version of section effective 1-1-2026. See also preceding version of this section, effective until 1-1-2026.       Sec. 12. (a) The supplemental fee in this section applies after December 31, 2017, to each electric vehicle and hybrid vehicle that is required to be registered under this article. The supplemental fee in this section does not apply to vehicles subject to the motor carrier fuel tax under IC 6-6-4.1 or motor driven cycles.       (b) As used in this section, "electric vehicle" means a vehicle that: (1) is propelled by an electric motor powered by a battery or other electrical device incorporated into the vehicle; and (2) is not propelled by an engine powered by the combustion of a hydrocarbon fuel, including gasoline, diesel, propane, or liquid natural gas.       (c) As used in this section, "hybrid vehicle" means a vehicle that: (1) draws propulsion energy from both an internal combustion engine and an energy storage device; and (2) employs a regenerative braking system to recover waste energy to charge the energy storage device that is providing propulsion energy.       (d) In addition to any other fee required to register an electric vehicle under this chapter, the supplemental fee to register an electric vehicle is one hundred fifty dollars ($150). The bureau shall determine a new fee amount to take effect as of January 1 of the following year by determining the product of the following: (1) Before October 1, 2023: (A) the fee in effect for the determination year; multiplied by (B) the factor determined under IC 6-6-1.6-2 (b). (2) Before October 1 of each year thereafter: (A) the fee in effect for the determination year; multiplied by (B) the factor determined under IC 6-6-1.6-3 . The fee shall be rounded to the nearest dollar.       (e) In addition to any other fee required to register a hybrid vehicle under this chapter, the supplemental fee to register a hybrid vehicle is fifty dollars ($50). The bureau shall determine a new fee amount to take effect as of January 1 of the following year by determining the product of the following: (1) Before October 1, 2023: (A) the fee in effect for the determination year; multiplied by (B) the factor determined under IC 6-6-1.6-2 (b). (2) Before October 1 of each year thereafter: (A) the fee in effect for the determination year; multiplied by (B) the factor determined under IC 6-6-1.6-3 . The fee shall be rounded to the nearest dollar.       (f) The fee shall be deposited in the local road and bridge matching grant fund established by IC 8-23-30-2 .

‹ Prev All Indiana sections Next ›


Lexace provides legal information, not legal advice, and no attorney–client relationship is created. Statute text is provided for general information and may not reflect the most recent amendments; verify against the official state code.